Regular Maintenance Program for Pressure Washing Concrete
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Laura Long on
Hi, Could anyone tell me what would be considered "regular" maintenance for pressure washing concrete to be able to use the higher SRI value for the concrete?
ACP Form
posted by Omar Elrawy on
Dear all, I've got a reviewer comment on SSc6.1 stating that ".
Study Guides and Practice Exams for LEED v4
posted by Cindy Davis on
I have learned from MADCAD that LEED Study Guides will not be published by USGBC.
Measurement doubt
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Andres Giraldo on
We have large area of natural landscape with vegetative and adapted vegetation in certain percent of it.
LEED Boundary & Covered Parking (Vegetated Roof)
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Rashida Mogri on
We designed a building/garage right up against an existing building/garage.
Anticipated Tenant Fit Out
CS-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo
Sound Transmission
NC-v4 EQc9:Acoustic performanceposted by Mark Zoeteman on
Sound transmission requirements for adjacency combinations are listed in Reference Manual Table 1.
M&V Plan Doubt
NC-2009 EAc5:Measurement and Verificationposted by Marina Andrade on
Hi everyone, i'm studying the protocol of measurement & verification, and checked out some necessary points which must be in the plan but did not quite understand.
Exterior lighting artwork - Process Load
NC-2009 EAc1:Optimize Energy Performanceposted by Victoria Watson on
Hi, I am working on a project where they are proposing a lighting installation forming a piece of artwork. They are asking whether it can be excluded from the LEED calcs.
reused water for cooling towers and process saving
NC-2009 WEc3:Water Use Reductionposted by Renaud Gay on
Hello We work on an pharma project and we want to resuse MAU condensate, on-site treated waste water and rain water to supply toilets, irrigation and Cooling towers.