Forum quick links
Worst condition?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Noriko Nagazumi on
From the requirements: "Verify performance of the smoking rooms’ differential air pressures by conducting 15 minutes of measurement, with a minimum of 1 measurement every 10 seconds, of the differe
Material documentation
NC-2009 MRc4:Recycled Contentposted by Nouran Abdel-Rahman on
We receive letters from suppliers and manufacturers documenting the recycled content of the materials, but not declaring the cost per item.
Campus-Same master site- LEED NC v4 and LEED EBOM 2009
posted by FRAGKISKOS LEVANTIS on
In a commercial campus 3 individual projects are pursuing certification under LEED EBOM 2009.
Please update checklist above
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Lyle Axelarris on
The "Document credit compliance on LEED Online" portion of the checklist provided above needs to be corrected to avoid further confusion. 1.
FTE calculation for a Dorm
NC-2009 PIf3:Occupant and Usage Dataposted by Nelina Loiselle on
How would we calculate FTE for a dormitory that all full and part-time employees are residents within the building.
fire supression gas FM200
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Regina Gul on
Is gas FM200 allowed for fire supression systems?
Problems Downloading Project Reports
posted by Charles Nepps on
Does anyone else out there have problems downloading Reviewer's project reports from LEED Online(V3)?
Showers/Changing rooms at another level.
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Devanand Ragbir on
Our bicycle racks are next to an elevator which travels up 80ft to a gym which has the required no. changing/shower rooms. The gym is accessible to all the building occupants.
Outdoor air requirements in corridors
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ricardo Sá on
I' m currently working on a school project where most of the corridors have an exhaust system, that induces make-up air from the adjacent classrooms and (eventually negligible) infiltrated air dire
Ductwork
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Megan Bove on
Hi. At what moment of a project does the IAQ reporting need to occur?