Horse Riding Arena
NC-2009 WEc3:Water Use Reductionposted by Kavita Karmarkar on
Is the water used for bathing horses in a horse riding centre to be included in the water use reduction calculations? If yes, then is it to be under the showers category???
ventilation through docks
NC-2009 IEQp1:Minimum IAQ Performanceposted by Alicja Bieszyńska on
Hi all, I'm working on a distribution center project that intakes the air by docks and exhusts it through fans in the roof.
Dry pre mix mineral based bonding coat
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Jovelyn Lagunday on
I am confused how to identify if this products should be considered as Adhesives and Sealants or Paints and Coatings. Need your advise please. Thank you.
Option 2 - CIR's
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Donald Green on
Can anyone who submitted a CIR for Option 2 regarding a campus situation post your results?
Portfolio Manager entries
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by cathy keagle on
Does LEED require the costs of the energy to be entered
Manual Pruning & Hand Weeding
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by LUCY WILLIAMS on
I have been using the LEED User template for the required written management plan.
Industrial Condominium Certification
posted by Tamara Quiroz on
A real state firm ask us for a valid certification for a Industrial Condominium project of 400 hectares approx.
Bamboo flooring materials
NC-2009 MRc6:Rapidly Renewable Materialsposted by Lilian Seow on
What are the documents required from the contractor to complete this credit?
Option 2 - one time fee or annually
NC-v4 SSc2:Site development - protect or restore habitatposted by Lorne Mlotek on
I noticed that in EBOM v4 the financial contribution of $0.05 must occur annually Seeing as this is $0.40, am I correct to assume it is a one-time fee?
Interior Lighting Power Requirement in ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I am wondering whether EAp2 requires a project to fulfill the Interior Lighting Power Allowances in Section 9.5 in ASHRAE 90.1-2007 if Option 1 - Energy Modeling is used? The prerequisite language