v2.2 Combined verses Separate Design and Construction Submission
posted by Heidi Sentivan on
We are almost complete with construction of a project but have not submitted our design submission. Is there any advantage/disadvantage to submitting them as a combined submission for v2.2NC?
LEED NC 2009 for factory building
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
The project is a manufacturing facility. The main production block has other adjacent buildings such as admin, canteen, health center, utility and security blocks.
Please help-your perspective appreciated on transit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Brian Muldoon on
Developer creating a local TOD ... not a State of MD endorsed TOD. Proposes a shuttle bus line to convey commuters to commuter rail station.
A tower, podium and shared parking on the same site, LEED NC2009
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Mais B on
We have an administration complex consisting of two basement levels having parking and utility rooms, and above ground a 4-storey podium and a tower both serving as office spaces.
M&V-option3 for non-us projects
NC-2009 EAc5:Measurement and Verificationposted by ebru unver on
We are working on a NC project, in Turkey. Is our Project is eligible for option 3? Can you give some explanations? Thank you
NC vs Core & Shell for Mixed Use Building
posted by Mike Stopka on
Working on a project that is: 151,971 SF - multi-family residential units (30%) 168,780 SF - retail/future occupant build out (33%) 185,870 SF - parking (37%) In the past, we have used LEED NC for
Peak occupancy considering shifts
NC-2009 PIf3:Occupant and Usage Dataposted by LEED Pro Consultant on
Hello, We are calculating the occupancy in a project that works with shifts.
Preliminary Design Review
posted by Parker williams on
We are about to submit for preliminary design review; some consultants are not done with their assigned credit, but these are minor issues.
Product maintenance post certification
NC-2009 MRc4:Recycled Contentposted by Bob Korp on
Certification obtained, site occupied & used - fast forward a couple of years - any reason why Owner can't remove a recycled floor tile he doesn't like and replace it with a product of his choo
Circulation spaces
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Mike D on
Can circulation spaces be included in the Views calculations if they have access to views?