The project is a manufacturing facility. The main production block has other adjacent buildings such as admin, canteen, health center, utility and security blocks. All the blocks are independent and not connected to one another. Do we have to model all the blocks together or follow campus guidelines and show mandatory compliance of 10% for each block? The utility, security, health center blocks are very small and conditioned area is mostly less than 500 sqft in these blocks.