Forum quick links
EP - Option 3
EBOM-v4 SSc3:Heat island reductionposted by Lorne Mlotek on
This option states achieve both EP options 1 and 2. How does this make sense. Are you able to earn more than one EP per credit.
Permanent furniture
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Pascal Genest-Richard on
We would like to know if it is possible to start the flush out (and maybe even finish it) before all permanent furniture is installed.
LEED v4 Green Associate Exam (for Non-US/International)
posted by Mei Velas-Suarin on
Hello LEEDusers! I am a newly-registered member and I would like to thank everyone (esp.
Documenting costs and cut sheets
NC-2009 MRc3:Materials Reuseposted by John Covello on
Hello, Our project will be purchasing old teak wood (in good shape) from housing that is to be demolished. The invoices may be simple hand written pages noting the pricing and date.
Hi,
We have a project where
NC-2009 IEQc7.1:Thermal Comfort—Design
posted by Mayank Bhatnagar on
Hi, We have a project where design mandates space usage as manufacturing facility with met rates of 2.2, clo values of 0.6 and air velocity of 120 ft/min or 0.6m/sec.
Downloading Review Report
posted by Charles Nepps on
Does anyone else have problems downloading the Review Report from LEED Online?
Residential Type Sinks in Middle School Classroom
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Sara Zoumbaris on
Hi, We are working on a middle school that has 2, Home Economics classrooms with residential kitchen-style fixtures; I would assume these should be included within my calculation?
Chemical/Hazardous Gas Area Separation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Jason Warner on
We have a project that has a garage which needs to have self-closing doors and deck to deck walls or hard lid to other areas.
calculating FTE
Schools-NC-v4 WEp2:Indoor water use reductionposted by Charli Holt on
I am working on a project in Hammond, LA for a university. The building is 2,000 sqft and is a "teaching sustainability center". I am unsure on how to calculate the FTE's for WEp2 etc.
Commissioning Manual and Report
NC-2009 EAc3:Enhanced Commissioningposted by Jalal Avades on
Our project commissioning exercise filled more than 30 binders and if we scan them and upload them it will be couple of Giga Bytes of files.