Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pellets

NC-2009 EAc2:On-Site Renewable Energy
posted by  Emmanuel Pauwels  on 

Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?

1
Tue May 27, 2014, 3:40 pm

Appeal process

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Marcio Alberto Casado Pereira  on 

Folks, This is our first time submitting an appeal. As I clicked on "submit for review" under the "timeline" tab i was redirected to that screen where you select the credits you want to submit.

1
Fri Aug 8, 2014, 7:07 pm

Process Loads

CS-2009 EAp2:Minimum Energy Performance
posted by  Rodrigo Vazquez  on 

We are working on a project in Mexico City, to comply with the prerequisite 2 we are following Option 1, whole building energy simulation. In the first simulation we´d done of the energy model we c

1
Tue May 27, 2014, 4:11 pm

Occupancy Sensors for 'Back of House' space

CS-2009 EAp2:Minimum Energy Performance
posted by  Laura Charlier  on 

As it relates to occupancy sensors being installed in all 'back of house' spaces for this credit, what encompasses back of house spaces? Is there a comprehensive list? i.e.

1
Tue May 27, 2014, 4:16 pm

DEMAND RESPONSE energy modeling

NC-v4 EAc2:Optimize energy performance
posted by   Habitech Distretto Tecnologico Trentino  on 

How is it possible to take advantage of energy use reduction due to DR systems in EAp2-EAc1 energy modeling? Is there any reference guide or document as those for the "key cards" for example?

1
Tue May 27, 2014, 4:19 pm

LEED-CS, CI or EBOM?

LEED Rating System Selection
posted by  Eleftherios Zacharakis  on 

Hi, our client owns a building where there are two tenants, one occupying 75% and the other 25% of the total floor area.

1
Mon May 26, 2014, 4:24 pm

Outdoor air delivery monitoring

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Rodrigo Vazquez  on 

If the project is a core & shell design and the distribution of the area is not know (tenants space) yet, is it correct to specify only a CO2 sensor on the return duct of the AHU?

1
Mon May 26, 2014, 6:46 pm

SRI Testing Labs, Do They Need to be Certified in some way?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Erin D.  on 

For users who are not using a roofing material with a known SRI, or for manufacturers who want to add SRI data to their product data sheets, does the lab they send their samples to need to be certi

1
Sat Jul 26, 2014, 6:09 am

LEED NC for two buildings from 15

LEED Guidance for Campuses and Multiple Buildings
posted by  Somsak Jidmon  on 

Hi, If the project comprise of 15 buildings in one site and the owner would like only two buildings to be LEED certified.

1
Tue May 27, 2014, 2:51 pm

NYC project

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Megan Bove  on 

Hi. I have a project in the city where subway grates are found right outside the project fence as well as always a storm drain that is on a very busy street.

1
Tue May 27, 2014, 3:42 pm