NC-2009 EAc2:On-Site Renewable Energyposted by Emmanuel Pauwels on
Would pellets made of mill residue be considered as renewable for this credit considering the fabrication process of pellets involves a chemical and/or physical treatment?
Appeal process
posted by Marcio Alberto Casado Pereira on
Folks, This is our first time submitting an appeal. As I clicked on "submit for review" under the "timeline" tab i was redirected to that screen where you select the credits you want to submit.
Process Loads
CS-2009 EAp2:Minimum Energy Performanceposted by Rodrigo Vazquez on
We are working on a project in Mexico City, to comply with the prerequisite 2 we are following Option 1, whole building energy simulation. In the first simulation we´d done of the energy model we c
Occupancy Sensors for 'Back of House' space
CS-2009 EAp2:Minimum Energy Performanceposted by Laura Charlier on
As it relates to occupancy sensors being installed in all 'back of house' spaces for this credit, what encompasses back of house spaces? Is there a comprehensive list? i.e.
DEMAND RESPONSE energy modeling
NC-v4 EAc2:Optimize energy performanceposted by Habitech Distretto Tecnologico Trentino on
How is it possible to take advantage of energy use reduction due to DR systems in EAp2-EAc1 energy modeling? Is there any reference guide or document as those for the "key cards" for example?
LEED-CS, CI or EBOM?
posted by Eleftherios Zacharakis on
Hi, our client owns a building where there are two tenants, one occupying 75% and the other 25% of the total floor area.
Outdoor air delivery monitoring
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Rodrigo Vazquez on
If the project is a core & shell design and the distribution of the area is not know (tenants space) yet, is it correct to specify only a CO2 sensor on the return duct of the AHU?
SRI Testing Labs, Do They Need to be Certified in some way?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin D. on
For users who are not using a roofing material with a known SRI, or for manufacturers who want to add SRI data to their product data sheets, does the lab they send their samples to need to be certi
LEED NC for two buildings from 15
posted by Somsak Jidmon on
Hi, If the project comprise of 15 buildings in one site and the owner would like only two buildings to be LEED certified.
NYC project
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Megan Bove on
Hi. I have a project in the city where subway grates are found right outside the project fence as well as always a storm drain that is on a very busy street.