Forum quick links
Adding floors within an existing volume.
NC-2009 PIf2:Project Summary Detailsposted by Erica Downs on
Hello - I posted this already down the list, but I'm afraid it's too buried, so reposting....
Path 7
CI-2009 SSc1:Site Selectionposted by Robin Dukelow on
I have a situation where the project team members are seeing different versions of the same form.
sensor vs. aerator
NC-2009 WEc3:Water Use Reductionposted by Ashley Nedza on
It seems that having a faucet with a sensor could actually save more water than a faucet with an aerator because the sensor will actually cut the water off. Does anyone have an opinion on this?
No change in HVAC?
CI-2009 EAp2:Minimum Energy Performanceposted by John-David Hutchison, LEED AP BD+C, PMP on
I have a client investigating LEED-CI for a upcoming project. Interior fit up, but no change in HVAC system for a building built in the 1980's. Does this prerequisite subscribe to existing HVAC o
Documentation requirements
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Erin Holdenried on
Hello, I have a project where a large area of existing forest, about 120 acres will be preserved. What kind of documentation is required for this credit?
Baseline HVAC type
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Marcus. We have a healt care building and I would like to know if my baseline HVAC model approach is correct. The building has 12 floors.
Cogen Gas Rates
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
Hello all, We are attempting to model a cogen system (using gas to create electricity and using waste heat for domestic water heating). My questions are as follows: 1.
LEED EBOM application day
EBOM-2009 MPR5:Must comply with minimum occupancy ratesposted by Geraldine Seguela RAIA on
We are a newly built hospital overseas. We have completed construction last April. But we're not operating yet.
Anti-corrosive primer and paint on external metal elements
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Joanna Bloniewska on
We need to apply an anti-corrosive primer and paint on metal elements, which are anchored into external face of main precast structure.
Borrowed Daylight
NC-v4 EQc7:Daylightposted by Razan Nejem on
when demonstrating a daylight simulation, shall the interior glazed areas be excluded from the calculation because light traveled through multiple layers of glazing