Hello Marcus. We have a healt care building and I would like to know if my baseline HVAC model approach is correct. The building has 12 floors. So it will classified as system 7 (VAV chiller water with reheat). However floors 9 to 10 are patient rooms. Floors 3 to 8 there are areas that have special presurisation and cross-contamitantion requirements. Floors 1 and 2 are general support areas. My approach is the following Floors 1 and 2 System 7 Floors 3 to 8 system 3 and 4 according to exeption G3.1.1 phragraph c Floors 9 to 12 system 2 -PTHP (residential) Do you think my approach is valid. Thanks.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.