Forum quick links
Anticipated Type?
posted by Anna Lehr on
Hello, I am registering a project at the USGBC website, and would like to get input regarding the best categorization of our building "type." We have appx.
Construction within LEED boundary after completion of original
NC-2009 PIf2:Project Summary Detailsposted by Heather DeGrella on
Our project that has been submitted for certification was completed in early 2012. The project was built exactly as it was submitted for the LEED review.
Project In Dubai.
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Samer Alhmdan on
we have got a project in Dubai, the site witnesses very nominal rainfall in a year (average
Skylight coverage
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Adrienn Gelesz on
Hi, in case of a not meeting the skylight coverage ratio of 3-6% for the total room space, e.g.
Alternate Compliance Concept - Thoughts?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Eric Thompson on
We have a situation where our site only has one bus line with a stop within 1/4 mile (though 2 other stops are within 1/2 mile). However, the one bus line is very frequent and runs all day.
Wood Cladding adhesives
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nouran Abdel-Rahman on
We are applying wood cladding for the walls. To assign the cladding panels, firstly we apply wood framing to the walls then fasten the panels to them.
Window Frames and Window Area
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Larry Turbes on
Does LEED's "window area" take into account framing or is "window area" the actual glass area (excluding framing)?
Minimum Indoor Air Quality Calculation (Natural Ventilation)
NC-2009 IEQp1:Minimum IAQ Performanceposted by JP Rout on
We are pursuing for Fresh Air calculations for a Building with Natural Ventilation, as per the ASHRAE 62.1-2007 requirement, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Perform
Campus Fees
posted by Eduardo Straub on
Hi, I`m confused in how to calculate de fees for Campus projects. I have a project with 6 warehouses in the same site (LEED NC 2009).
Adding credits between preliminary review and final review...
posted by Rick Alfandre on
I have read through a fair amount of comments above, but did not see my specific question addressed, so I will pose it: We are submitting construction phase preliminary review.