Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ASHRAE vs. ISO/EN

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  Jens Apel  on 

I am happy that LEED is accepting ISO 7730 and EN 15251 as alternative to ASHRAE 55.

1
Thu Dec 31, 2015, 10:31 pm

Garage entrances to building

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Maria Isabel Conde  on 

Hi, We have a project with 7 parking floors. Every floor have an entrance with access to elevators and stairs. We want to know if that entrances should be closed.

1
Tue Nov 4, 2014, 9:24 pm

District Thermal Energy and Single LEED project boundary

NC-2009 EAp2:Minimum Energy Performance
posted by  MARCIO OROFINO  on 

The project comprises four hospital buildings, called B, C, D and E, and each building is registered as an individual project on a campus basis.

1
Thu Apr 3, 2014, 3:16 pm

Path 12 - is Enhanced Refrigerant Management (LEED NC EAc4)

CI-2009 SSc1:Site Selection
posted by  R Jones  on 

Has anyone successfully submitted the Enhanced Refrigerant Management credit ( LEED NC or CS) for a Base Build as an "Other Quantifiable Environmental Benefit" under LEED CI ?

1
Fri Jul 25, 2014, 11:25 pm

Modular Homes

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Covello  on 

We are looking at a local modular home design. I have seen modular homes on line being advertised as LEED certified.

1
Fri Apr 4, 2014, 9:39 am

Green educational program

NC-2009 IDc1:Innovation in Design
posted by  Bernardo Ruiz Montoya  on 

Hi experts, I’m currently pursuing the point given for the Innovation and Design (green educational program).

1
Mon Apr 7, 2014, 3:43 am

Become a LEED committee member!

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Theresa Backhus  on 

We want to notify those subscribed to this forum of the LEED Committee Call for Volunteers: an opportunity to play a critical role in developing and maintaining the LEED rating system.

0

Wall Base Material

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Catherine Adams  on 

Under IEQc4 table 4-6, the only option in the Product Type drop-down for wall base is specifically for "Rubber Wall Base". Does this mean other types of base (i.e.

1
Fri May 16, 2014, 7:37 pm

Commissioning of a factory machine

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Jatuwat Varodompun  on 

Does it need to include Machines (to produce goods) in the scope LEED CxA?

1
Sun Apr 13, 2014, 2:56 pm

Baseline Energy modelling using air cooled chillers

NC-2009 EAc1:Optimize Energy Performance
posted by  Lakshmi Suryan  on 

I am working on a LEED project in Qatar and wanted to query USGBC on using aircooled chillers in the baseline building instead of water cooled chillers.

1
Mon Apr 7, 2014, 1:33 pm