ASHRAE vs. ISO/EN
CI-2009 IEQc7.1:Thermal Comfort—Designposted by Jens Apel on
I am happy that LEED is accepting ISO 7730 and EN 15251 as alternative to ASHRAE 55.
Garage entrances to building
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maria Isabel Conde on
Hi, We have a project with 7 parking floors. Every floor have an entrance with access to elevators and stairs. We want to know if that entrances should be closed.
District Thermal Energy and Single LEED project boundary
NC-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
The project comprises four hospital buildings, called B, C, D and E, and each building is registered as an individual project on a campus basis.
Path 12 - is Enhanced Refrigerant Management (LEED NC EAc4)
CI-2009 SSc1:Site Selectionposted by R Jones on
Has anyone successfully submitted the Enhanced Refrigerant Management credit ( LEED NC or CS) for a Base Build as an "Other Quantifiable Environmental Benefit" under LEED CI ?
Modular Homes
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Covello on
We are looking at a local modular home design. I have seen modular homes on line being advertised as LEED certified.
Green educational program
NC-2009 IDc1:Innovation in Designposted by Bernardo Ruiz Montoya on
Hi experts, I’m currently pursuing the point given for the Innovation and Design (green educational program).
Become a LEED committee member!
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Theresa Backhus on
We want to notify those subscribed to this forum of the LEED Committee Call for Volunteers: an opportunity to play a critical role in developing and maintaining the LEED rating system.
Wall Base Material
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Catherine Adams on
Under IEQc4 table 4-6, the only option in the Product Type drop-down for wall base is specifically for "Rubber Wall Base". Does this mean other types of base (i.e.
Commissioning of a factory machine
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jatuwat Varodompun on
Does it need to include Machines (to produce goods) in the scope LEED CxA?
Baseline Energy modelling using air cooled chillers
NC-2009 EAc1:Optimize Energy Performanceposted by Lakshmi Suryan on
I am working on a LEED project in Qatar and wanted to query USGBC on using aircooled chillers in the baseline building instead of water cooled chillers.