Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Confused by Third Party reporting tequirement of Option 3

NC-2009 EAc5:Measurement and Verification
posted by  Renee Shirey  on 

I would love some insight on why, if going for Option 3, the whole-building water and energy usage data reporting MUST be done by a Third Party Data Source, vs. the actual Owner?

1
Sun Mar 23, 2014, 8:13 pm

Steel coils counted as recovered/extracted?

NC-2009 MRc5:Regional Materials
posted by  Jennifer Ratts  on 

Are steel coils counted as recovered for this credit? I have several products where steel coils are used. Does this count?

1
Fri Mar 21, 2014, 9:51 pm

New DES commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Shevaun Barrie  on 

Hi, We are commissioning a building that will be connected to a DES that was completed in 2012, so it is considered "new".

1
Tue Mar 25, 2014, 7:53 pm

Natural System Instead of Public Sewer.

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  JOSE R. TAGLE  on 

Hi everyone! We are working on previously undeveloped land project, which apply for case 1 “site with existing imperviousness 50% or less”.

1
Fri Jul 25, 2014, 5:11 am

No irrigation, No landscape - option 2 compliance

NC-2009 WEc1:Water Efficient Landscaping
posted by  Nicole Kimoto  on 

I'm working on a project where the existing site is 100% concrete paving. We are not providing any landscape, thus no irrigation. Does this mean we comply with option 2?

1
Sat Mar 22, 2014, 2:05 pm

RockWool MR6

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Al Shadid  on 

Is rockwool considered a rapidly renewable material? I understand that rapidly renewable materials must be made from either plants or animals and must have a harvest cycle of 10 years or less.

1
Sun May 11, 2014, 2:10 am

2 separate CI spaces, 1 project?

CI-2009 MPR2:Must be a complete, permanent building or space
posted by  Charles Nepps  on 

I am working on a project where we are doing TI work on two different flloors, of the same building, for the same tenant. Can this be treated as 1 project for CI 2009 certification purposes?

0

Hello,
We have a previously

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Magda Aghababyan  on 

Hello, We have a previously developed project that does not meet the site area for protect and restore habitat.

1
Fri Apr 25, 2014, 4:04 pm

LEED NC - Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  sompoche sirichote  on 

We are working on a project that consists of 2 buildings: office building and workshop building.

0

Rating System?

NC-2009 PIf2:Project Summary Details
posted by  Racha Rachwan  on 

I'm working on a project containing one Basement, Ground and a first floor, it is a residential building, its building footprint meets the minimum program requirement.

1
Mon Apr 7, 2014, 3:05 pm