CxA's commissioning activities

CI-2009 EAc2:Enhanced Commissioning
posted by  Bilge Ceylan  on 

The owner in my CI project is planning to appoint the operations and maintenance (O&M) firm as the CxA to achieve this credit.

1
Wed Mar 5, 2014, 1:24 pm

Once Through Cooling

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Farah A.  on 

Can cooling equipment with once through cooling, that utilizes NONPOTABLE water, be applicable for this credit or is it also ineligible? Could not locate this in the reference guide

1
Tue Feb 18, 2014, 3:57 pm

Water Savings Calculation

NC-2009 WEc3:Water Use Reduction
posted by  Farah A.  on 

Design/Baseline

1
Mon Feb 24, 2014, 12:49 pm

CO2 sensors in return air duct instead of within the room

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Ian McCall  on 

Hello, As per the CIR # 2142 (http://www.usgbc.org/leed-interpretations?keys=2142), it seems that USGBC allowed CO2 sensors in return air duct, but as the CIR concerned also others topics (i.e.

1
Tue Feb 18, 2014, 5:00 pm

Surrounding Density and Diverse Uses

General forums
posted by  Melissa Wrolstad  on 

Hello, The Surrounding Density and Diverse Uses credit is 71% more stringent in LEED v3 than LEED v4 (requirement in LEED-CI dropped from 60,000 sqft/acre for 6 pts to 35,000 sqft/acre for 6pts.)

0

Qualifying Out-patient Population

Healthcare-v2009 SSc9.2:Connection to the natural world - direct exterior access for patients
posted by  Norma Lehman  on 

we are pursuing LEED HC for a health clinic on a university campus where there is no in-patient population and no out-patient population meeting the description or length of stay indicated in the r

1
Tue Feb 18, 2014, 10:20 pm

Building with different uses

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  Manuel Broll  on 

Hi there, i am a little bit confused about the egibility of a building. Within the building there is office (60%), retail (30%) and underground parking (10%).

1
Mon Feb 24, 2014, 11:34 pm

BMP Non Compliance and / or Removal of BMP Mid-project.

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Richard Palmer  on 

Please could someone advise as the best way to report the removal of a BMP from the ESCP midway through the project?

1
Mon Mar 3, 2014, 8:15 pm

Included Furniture

Schools-2009 IEQc4.5:Low-Emitting Materials—Furniture and Furnishings
posted by  Johannes Gellrich  on 

Hello all, I have problems to determine the necessary extent of furniture: The guide says "Classroom furniture including all Student and teacher desks [...]". Do we only have to implement desks, ta

0

How strictly is the "accessible location" interpreted?

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Christina Nguyen  on 

We have a 3-story classroom building for a community college.

1