Forum quick links
LEED Addenda
posted by Thomas Mazich on
I just got the email notifying me of the quarterly addenda with the reminder: "Project teams are required to adhere to rating system corrections and LEED Interpretations based on LEED registration
baseline HVAC system selection
CS-2009 EAp2:Minimum Energy Performanceposted by Agnieszka Rylska on
I would like to clarify the basis of baseline HVAC system selection in energy modeling. Selection is based, among others, on number of floors and conditioned floor area.
LEED Rating System - which one?
posted by Katherine Sheesley on
Academic building of 75,000 SF on 3 floors with multipurpose class labs, faculty office and classrooms on a community college campus. Should the LEED v4 NC or LEED v4 Schools rating system be used
EBOM v4 VS EBOM v2009
NC-2009 PIf1:Minimum Program Requirementsposted by DAVIDE FILIPPI on
Hey everyone! I'm new here. I'm an italian student of a Master, and I'm starting to study Leed for EBOM. I don't have the reference guide of this rating system, I hope it will arrive soon.
Hazardous Gases or Chemical Exhaust
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Stephen DeGrazio on
What is meant by "Average Differential Pressure"? In my case, i have 4 janitor's closets and a recycling room on the same fan.
Option 1 with no dedicated smoking areas
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Annalise Reichert on
I am working on a project that has installed signage near major entrances that prohibits smoking within 25 feet of all doors and windows.
Allocating Green-e Certified power to EAc2 and EA6
NC-2009 EAc2:On-Site Renewable Energyposted by Adam Prince on
We have a LEED NC project in Massachusetts (Office space with 2 residential units above). On the roof will be a PV system producing just over 50% of the buildings total energy consumption.
USGBC-approved wood certification schemes
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jane Wigren on
Where can I find a list over USGBC-approved wood certification schemes? I am especially interested in those found outside of the United States.
Equation 1. Volume of Captured Runoff
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Ahmed Mosa on
Why is equation 1 divided by 12" ? Vr=(P.Rv.A)/12"
On Site Renewable Energy accreditation
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Alicia Villanueva on
We are working in a project where the local government wants to certify its main administrative office building. They want to install PV panels but they no longer have available space on this buil