Forum quick links
IEQp1 LEED Online form what to input?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Kasandra Martin on
For ASHRAE 62.1 do I upload forms for the Baseline of meeting ASHRAE 62.1 and not my forms for IEQc2 Increased Ventilation? Table IEQp1-3.
Landscaped park across from project building
NC-2009 WEc1:Water Efficient Landscapingposted by Alfred Servodidio on
Our project is an historic building in downtown NYC. The owners of the building are contributing to the restoration of the small park directly across the street from the building.
High performing existing baseline building.
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Steven Beccia on
Hello All, I am looking to get some clarification or consensus regarding modeling the baseline HVAC systems for EAc1.3. My specific scenario is that we have a core and shell building, under const
Renovation project and LEED certification of the addition only
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Smith on
Quick question please: I have an existing building of 1000 sq ft. 700 sq ft of them are to be renovated, the remaining area is to left intact. There will also be a brand-new addition of 500 sq ft
Nature Trail
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Marissa Hebert on
If you use a universal access nature trail as part of your Places of Respite, does the trail have to provide shaded seating?
Simulation approach strategy.
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by TOMAS URIBE on
Hello Marcus. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.
Minimum occupancy requirements for projects pursuing LEED NC
posted by Guillermo Hernandez Espinoza on
Hi. The project is registered under LEED BD+C: New Construction v2009. Is there any Addenda that perhaps changed what is required for a project pursuing LEED NCv2009 from 50% to 0%? (For such a
ASHRAE 90.1-2007 - 6.4.3.1.1 COMPLIANCE CRITERIA
CI-2009 EAp2:Minimum Energy Performanceposted by RICARDO HERNANDEZ on
Does anyone know how stringent is the criteria to achieve compliance with the 6.4.3.1.1 Zone Thermostatic Controls for a Commercial Interiors?
Redrawing Project Boundary AFTER Initial Review
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by C.M. G. on
Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.
Where are the Import Facility Data Templates?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Lewis Hewton on
Can somebody please direct me where to find the 'import facility data' templates on the Energy Star website?