Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED HC WE p1 - Process water use terminology

Healthcare-v2009 WEp1:Water use reduction
posted by  Sasha Peters  on 

Can someone please tell what is the meaning of "ADO" as mentioned in the LEED HC template WE p1 - Process water use reduction? It seems to be a value affecting total water use. Thanks.

1
Thu Nov 14, 2013, 2:23 pm

Multi Layered App-Shop Primer-Primer-Topcoat VOC Numbers

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Nilufer Senses  on 

We have multi-layered, anti-corrosive coating application for the steel structural elements in the interior. Layering is like this: Shop Primer, Primer and Top Coat.

1
Thu Nov 14, 2013, 2:44 pm

Process Energy

CI-2009 EAp2:Minimum Energy Performance
posted by  Graham Langton  on 

All, How does LEED CI and section 11 modelling view process energy? For an industrial / manufacturing facility with new process equipment in particular. In 90.1, process energy is not dealt with.

1
Thu Nov 14, 2013, 6:02 pm

Clarification for LEED CI

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Rebekah Burke  on 

If we are doing a tentant improvement for the entire interior of a building, is it eligible to be certified under LEED-CI.

1
Mon Dec 2, 2013, 3:59 pm

Returned product recycling

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Andy Plogsted  on 

The project that I'm working on contains a warehouse for shipping sold products. At times, metal products are returned because they are damaged or defective.

1
Fri Dec 20, 2013, 6:10 pm

Daylight and Views - Simulation Documentation

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Candice Rogers  on 

Hello - This is my first time using the Simulation option for documenting Daylighting. For the Supplemental Daylight and Views Calculation Worksheet, do we represent our 5 ft.

1
Thu Nov 14, 2013, 10:39 pm

punch list for air testing option?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

the LEED reference manual states that punch list must be completed prior to flush out. However, it doesn't state either way if punch list must be completed prior to air testing.

1
Sat Nov 16, 2013, 1:27 am

FSC Registration

NC-2009 MRc7:Certified Wood
posted by  Ronnie Oleary  on 

ADVICE-01-010 FSC Online Claims Platform (OCP) Criteria Has anybody seen this? It looks to me like it is just getting certificate holders registered, which seems pretty easy.

1
Fri Nov 15, 2013, 9:27 pm

Water Reporting via approved methods

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Sara Goenner Curlee  on 

As I look through the two options to report energy and water usage, I'm a little unclear how one exactly reports the water consumption of a building.

1
Fri Dec 20, 2013, 8:50 pm

Superstructure vs. Multiple Buildings Mid-Review Clarification

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Matthew Macko  on 

I am currently working on a large, outdoor retail shopping mall that includes multiple buildings, however we want to claim these buildings are more like connected ‘structures’ and therefore the who

1
Fri Nov 15, 2013, 6:34 pm