Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Alternative Transportation Education Option 7

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Alfred Servodidio  on 

As defined in the handbook-Provide an accessible board or computer display in the retail area for both employees and customers that provides transportation information.

1
Thu Nov 14, 2013, 11:58 pm

Are MERV equivalent filters for international projects accepted?

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Jenelle Shapiro  on 

Hello - I'm working on a project in Japan, and the MERV rating system is not used here.

1
Wed Nov 13, 2013, 1:27 am

Deciding to choose Option 1(D) or Option 2(B)

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  James Keohane  on 

I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.

1
Wed Nov 13, 2013, 2:31 pm

VAV System with Reheat

NC-2009 EAc5:Measurement and Verification
posted by  Maya Karkour  on 

Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi

1
Wed Nov 13, 2013, 2:51 pm

Building Envelope Commissioning

Healthcare-v2009 EAc3:Enhanced commissioning
posted by  Kerrie Racicot  on 

BECx can be wide open when it comes to scope. Is there some guidance regarding the scope that LEED is looking for? Thank you,

0

Assuring that reviewer holds us to v2 requirements

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  caitlin sweeney  on 

I am about to submit one of our projects for review under v2 version.

1
Sat Nov 16, 2013, 5:06 pm

Request zip files for download

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Crina Bosch   on 

In LEED online version 2.0 there was the option to request and download the zip file for the complete, certified project. The zip file contained all the templates and files upload to the site.

1
Wed Nov 13, 2013, 7:14 pm

Proper way to apply ASHRAE 62.1 to baseline model?

Schools-2009 EAp2:Minimum Energy Performance
posted by  Joseph Lewis  on 

I have a project where the proposed design has demand controled ventilation.

1
Wed Dec 4, 2013, 1:14 pm

mercury in specialty lamps (animal care)

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Saju Varghese  on 

We are having an issue because some animal care lamps of our project do not really disclose the mercury content of the lamps since they consider it as some part of their copyright of some sort.

0

comprehensive transportation management plan

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Nilo Regojo  on 

Our project complies with Option 2 - Bus Stop Proximity.

1
Mon Dec 2, 2013, 2:09 pm