Dear All,

We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone.

The current design assigns energy submeters combining both the electrical reheat with the small equipment power.

My query is: do we need to monitor / submeter the electrical reheat separately, given that it is not as significant as the total heating consumption from the building boilers?

Thanks!