Forum quick links
can partial credit be earned?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Becky Dix on
Our project is an expansion to a facility that hosts events/conferences in addition to its normal use as a lab facility, and while daily use would not require all the parking necessary by code, the
Acrylic enamel/lacquer in aerosol, non-flat
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Alicia Villanueva on
Good afternoon, does anyone know the VOC allowance for an acrylic enamel/lacquer in aerosol, non-flat? I do not know in which product type does this product falls into to take the VOC limit. Thank
Automatic controls required?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Nicole Kimoto on
I have a project that has a shop areas where building occupants will be working. It is very important that the light not turn off automatically when they are working.
Documentation of Comingled Waste
CS-2009 MRc2:Construction Waste Managementposted by Panupant Phapant on
If on site have some commingled waste , LEED Online form require us to provide supporting document. I wondering that what kind of this document? and What the topic are will involve in this?
HVAC System Type for Baseline Case
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, I have a question on which HVAC system type to choose for the baseline case for a project consisting of 4 buildings.
exhaust from recycle storage room?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Carrie Laurendine on
does the room that contains recycle storage bins need to be exhausted to the exterior?
recycle storage room exhausted?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Carrie Laurendine on
not sure which credit to put this question under. but not sure if the recycle room needs to be exhausted to the exterior - per IEQc5?
CDHP Testing
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Blakemore on
Under Option 2, does the furniture piece and the fabric have to be tested a whole, complete assembly together? Or can the furniture piece and the fabric be tested separately and then assembled? C
ASHRAE 62.1-2007 Table 6-4 & GBCI Review
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nathan Echtenkamp on
To date I have never received a comment from a reviewer regarding required exhaust per Table 6-4.
LCI datasets
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Oliver Grimaldi on
Is there any guidance regarding LCI datasets? In particular, expectations regarding regional specifics?