Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

What LEED system to use

LEED Rating System Selection
posted by  Camala Jones  on 

We are investigating the possibility of some renovation work. At the smallest it would be a connector from a second story walkway/hall over to an existing escalator platform.

1
Fri Nov 15, 2013, 3:25 pm

Type and sub-type area matrix IEQ EBOM

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Hector Miranda  on 

I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?

1
Fri Dec 20, 2013, 5:55 pm

Cork FSC certified?

NC-2009 MRc7:Certified Wood
posted by  Mario Pinoli  on 

Hi all, I would like to suggest an acoustic insulation in cork, but I’d like to share my opinion if consider or not cork as wood, to determine if include this materials in credit MR7. FSC consider

1
Thu Nov 7, 2013, 3:22 pm

How to claim savings for Equipment Power Density in LEED project

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  J I  on 

Currently I'm working on a commercial building compliance modeling for LEED CS program.

0

Faucets with Sensors

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  J Douglas Dietrich  on 

If we are installing low-flow faucets with vandal-proof aerators and sensors such that the water flow stops when a user's hands are not near the faucet, how should we account for that in the LEED t

1
Thu Nov 14, 2013, 9:09 pm

Surfaces

Pilot-Credits EQpc22:Interior lighting - quality
posted by  William Kelly  on 

We are appling for PC22 Lighting Quality. Regarding the requirements of Strategy E and Strategy F, what are the surfaces that are to be documented?

1
Wed Nov 20, 2013, 6:53 pm

10% exclusion of square footage "defined" for EBOM credits

NC-2009 PIf2:Project Summary Details
posted by  Wendy Parker, LEED AP  on 

Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?

1
Fri Nov 22, 2013, 6:26 pm

four IEQc3.2 questions....

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).

1
Sat Nov 16, 2013, 2:07 am

24 Month Performance Period vs Certification Application

Performance Period
posted by  Eric Pasi  on 

Greetings LEED Experts, I'm a little hung up on the 24 month maximum performance period vs the 60 day grace period for submission.

1
Fri Nov 8, 2013, 7:44 pm

LEED-NC 2009 with a future tenant space

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Derek Breuninger  on 

Our building project has a very small future tenant space.

1
Fri Dec 20, 2013, 11:08 pm