Forum quick links
What LEED system to use
posted by Camala Jones on
We are investigating the possibility of some renovation work. At the smallest it would be a connector from a second story walkway/hall over to an existing escalator platform.
Type and sub-type area matrix IEQ EBOM
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Hector Miranda on
I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?
Cork FSC certified?
NC-2009 MRc7:Certified Woodposted by Mario Pinoli on
Hi all, I would like to suggest an acoustic insulation in cork, but I’d like to share my opinion if consider or not cork as wood, to determine if include this materials in credit MR7. FSC consider
How to claim savings for Equipment Power Density in LEED project
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by J I on
Currently I'm working on a commercial building compliance modeling for LEED CS program.
Faucets with Sensors
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by J Douglas Dietrich on
If we are installing low-flow faucets with vandal-proof aerators and sensors such that the water flow stops when a user's hands are not near the faucet, how should we account for that in the LEED t
Surfaces
Pilot-Credits EQpc22:Interior lighting - qualityposted by William Kelly on
We are appling for PC22 Lighting Quality. Regarding the requirements of Strategy E and Strategy F, what are the surfaces that are to be documented?
10% exclusion of square footage "defined" for EBOM credits
NC-2009 PIf2:Project Summary Detailsposted by Wendy Parker, LEED AP on
Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?
four IEQc3.2 questions....
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carrie Laurendine on
1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).
24 Month Performance Period vs Certification Application
posted by Eric Pasi on
Greetings LEED Experts, I'm a little hung up on the 24 month maximum performance period vs the 60 day grace period for submission.
LEED-NC 2009 with a future tenant space
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Derek Breuninger on
Our building project has a very small future tenant space.