Basic learning...

Pilot-Credits WEpc17:Cooling tower water use
posted by  Kath Williams  on 

For a "non-engineer," could someone please explain what I'm hearing on the project testing this pilot credit--operator concern that cooling tower won't perform as designed and water-testing analys

1
Thu Oct 31, 2013, 5:18 pm

Maintenance Equipment 20% BMP Use Compliance

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Kasey Kudamik  on 

One question I have for documenting that 20% compliance of maintenance equipment and activities meet environmental BMPs is whether GBCI looks at the maintenance and landscaping activities as a whol

1
Fri Sep 13, 2013, 4:00 pm

compressed air

CI-2009 EAc3:Measurement and Verification
posted by  Adrienn Gelesz  on 

I have a manufacturing plant extension CI project were compressed air is entering the LEED space from the non-CI parts of the building. (

1
Fri Sep 13, 2013, 8:55 pm

Emergency Circumstances - Examples needed

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Elizabeth (Zeba) Floyd  on 

I'm looking for an example from an IPM Plan that has earned the LEED credit where the emergency circumstances were defined. What constitutes a typical 'emergency circumstance'?

1
Wed Oct 16, 2013, 9:42 pm

C02 Monitoring Project

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Aaron Doherty  on 

Hi all, I am doing an undergraduate senior project for my major requirement in my University. My partner and I are planning to monitor the levels of C02 in dorm rooms on campus.

1
Tue Oct 1, 2013, 2:33 pm

Using Ecotect Analysis for Access to Views Analysis

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Ghaith Tibi  on 

I would like to ask if it is acceptable to use the Visibility Analysis tool in Ecotect Analysis to document compliance with this credit.

1
Mon Sep 16, 2013, 8:25 pm

Barrakcs with a kitechen condidered LEED Homes or NC?

General forums
posted by  Tongsu Han  on 

1) My project is to renovate one barracks in US military base outside US States. It has three floors and 70 bedrooms with toilet. One central kitchen on each of floors will be located.

1
Tue Nov 5, 2013, 3:14 pm

LEED CS if no provision of Tenant's AC system by base building

CS-2009 EAp2:Minimum Energy Performance
posted by  Andrew Xiao Junzhao  on 

Dear LEEDuser community, I have a project which is about 60 storey commercial office building.

1
Tue Sep 17, 2013, 3:12 pm

Mandatory provisions of Closed-circuit cooling towers

CS-2009 EAp2:Minimum Energy Performance
posted by  Florinda Garcia   on 

My project is in the process of the LEED CS 2009 certification.

1
Tue Sep 17, 2013, 5:11 pm

CO2 monitoring densely occupied spaces, exemption rooms <150 sf

CS-v4 EQc1:Enhanced indoor air quality strategies
posted by  Maria Porter  on 

Why are not small rooms (less than 150 sf) exempt from the CO2 monitoring requirements? In EB:OM and several other places and standards they are.

1
Mon Nov 4, 2013, 7:17 pm