Materials to be included

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Michael Haugeneder  on 

We are working on a project in Berlin.

1
Mon Nov 4, 2013, 6:08 pm

Accessible Bus Stop

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Brett Beckemeyer  on 

Our project has several bus stops within the 1/4 mile radius, and what I would consider to be the most direct route along the street to the stops is also within 1/4 mile walking distance.

1
Sun Nov 3, 2013, 3:03 am

Rating System selection for an Existing Retail building

LEED Rating System Selection
posted by  Therese Malm  on 

We have a building which is an existing retail & manifacturing building. Which rating system is the most appropriate for seeking certification: EBOM or CI Retail?

1
Tue Aug 27, 2013, 5:50 pm

Green roof deck

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  mariela garate  on 

Hi, We are willing to use an innovative type of green roof that's based on compacted plastic waste board and textile (1,3cms thickness + textile). This substrate replaces the need of soil.

1
Thu Sep 5, 2013, 2:25 pm

Vacancy sensors in place of occupancy sensors

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Heather Dorer  on 

Can vacancy sensors be used in place of occupancy sensors in appropriate spaces? Vacancy sensors, like occupancy sensors, will turn the lights off when the room is deemed vacant.

1
Thu Aug 29, 2013, 2:06 pm

Is flush out possible in countries with high humidity?

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Katherine Ann Resurreccion  on 

Hi, we would like to know if flush out is practicable in areas where high humidity is experienced whole year, say 70-85%. Should we cancel out option 1 already and go for option 2 (IAQ testing)?

1
Tue Sep 3, 2013, 9:46 pm

Blower Door Test for Non-Smoking Hotel: IEQP2: ETS Control

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Sasha Peters  on 

Blower Door Test for Non-Smoking Hotel For a Hotel Project where the Owner has confirmed its policy to be entirely non-smoking, is the requirement to conduct blower door testing (IEQP2: ETS Contro

1
Wed Aug 28, 2013, 4:08 pm

G3.1.3.13 of ASHRAE 90.1-2007

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

I'm modeling a baseline model (System 5) and I have to apply G3.1.3.13 of ASHRAE 90.1-2007: "Minimum volume setpoints for VAV reheat boxes shall be 2.15 l/s*m^2 of floor area served or the minimum

1
Wed Aug 28, 2013, 2:06 pm

CS vs EBOM

LEED Rating System Selection
posted by  Markievicz E  on 

Hi All We have an unusual project... Completed in 2008 but remaining unoccupied thought the 'crisis'.

1
Wed Aug 28, 2013, 5:33 pm

Recertification under previous version

EBOM-2009 SSc1:LEED Certified Design and Construction
posted by  David Wood  on 

Has there been any clarification on recertification under previous version for this credit.

1
Wed Aug 28, 2013, 3:47 pm