Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

IAQ testing in a continuously occupied office

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Maggie Edelstein  on 

Our project is a government office that will be continuously occupied throughout the duration of construction.

1
Tue Sep 3, 2013, 9:47 pm

can we get credit for a future cistern?

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Saju Varghese  on 

If we have prepared piping but cistern is not installed yet and it will possibly be installed in the future, can we get credit for it?

1
Mon Nov 4, 2013, 9:55 pm

Categories and prescriptive path alternate option

General forums
posted by  Michael Miller  on 

I opted-in to the prescriptive CMP path near the initial deadline in 2011, so I am close to my first renewal.

1
Mon Aug 19, 2013, 9:24 pm

Question about Mechanical Ventilation

CS-2009 IEQc2:Increased Ventilation
posted by  Ron Dean  on 

Hello, My mechanical design normally consist of a big outdoor air fan supplier on the rooftop that delivers air to each floor (for mechanical ventilation) and then the future tenant will install h

1
Thu Nov 14, 2013, 1:51 pm

Exterior Color Absorptance (a)

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I need to know if there's a Basecase requirement for the exterior color absorption property, named "absorptance" in eQuest?, and if I can gain credits by using bright colors in the exterior, which

1
Tue Aug 20, 2013, 2:33 pm

Return plenums should be used in the baseline model?

NC-2009 EAc1:Optimize Energy Performance
posted by  Rosana Correa  on 

Hello, If in the proposed building there are plenums specified as return air path in the HVAC system, should I use them or ignore them in the baseline model? Thank you,

1
Tue Aug 20, 2013, 2:40 pm

On-site vs. Off-Site Campus Project

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Eddie Cuevas  on 

I am working on an EBOM project located on a college campus.

1
Fri Aug 30, 2013, 3:26 pm

thermal blocks & HVAC zones

NC-2009 EAp2:Minimum Energy Performance
posted by  VICTOR MORENO  on 

Hello, I´ve a question about thermal zonification in my energetic model. I use Energy+ and my proposed HVAC system is Geothermal Heat Pump, AHUs for ventilation requeriments, Fan-Coils and Radian

1
Tue Aug 20, 2013, 7:39 pm

LEED CERT ON PUBLIC PARK / FIELD HOUSE

General forums
posted by  Mars Dauer  on 

Hi i am doing a feasibility report on LEED certifying a couple field houses owned by public parks.

1
Fri Aug 23, 2013, 7:43 pm

Environmental Center serves students.

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Peter Doo  on 

I am advising an environmental education center that is in a town not served by public transportation. This is not a facility serving the general public on a walk-in basis.

1
Wed Aug 21, 2013, 1:36 pm