Open office - do I count the inner offices & meeting rooms?

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Stantec BG+LU FW  on 

I am doing the calculations for the "daylight factor method" for Daylight and Views credit. It is an office floorplate that is roughly 150'x150' with an inner core.

1
Wed Aug 7, 2013, 7:10 pm

Native and Adapted Plants

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Charlotte Page  on 

Hello everyone, New to LEED, and I have been trying to figure out who determines what is native and what is adaptive? Need to put a list together for the project that I am working on.

1
Wed Aug 7, 2013, 8:56 pm

Lighting load synergy in EAp2 and EAc1.2

CI-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?

1
Thu Aug 8, 2013, 2:58 pm

Lighting Load synergy EAp2 and EAc1.2

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Saju Varghese  on 

Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?

1
Thu Aug 29, 2013, 2:36 pm

beginner question about site area to be treated

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Patricia Weber  on 

hi there, here's what will probably be an easy question for you but is stumping me, as this is my first time documenting this credit.

1
Thu Aug 8, 2013, 11:57 am

Differential Pressure Test

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Michael Smithing  on 

We've conducted the differential pressure test and the average is around 7 pa. We've had the contractor test the room and report the results on the LEEDUser form.

1
Tue Nov 5, 2013, 3:29 am

The owner buys the energy

CI-2009 EAc4:Green Power
posted by  Mathilda Jonsson  on 

Hi all In my LEED CI project the tenant are sub metering their energy usage and are then paying the building the owner for the amount of energy used.

1
Thu Aug 8, 2013, 2:18 pm

Attached building

CS-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

There is an attached building to the building we simulate. Should thiis attached building be simulated in the proposed and baseline building or should it be exluded?

1
Thu Aug 8, 2013, 2:01 pm

Change in Ownership affecting Green Power Contract?

CS-2009 EAc6:Green Power
posted by  Joern Drosten  on 

Dear all, the company which does the site development of our project has entered a two-year power contract (100 % green power).

1
Mon Aug 12, 2013, 1:42 pm