I am doing the calculations for the "daylight factor method" for Daylight and Views credit. It is an office floorplate that is roughly 150'x150' with an inner core.
Native and Adapted Plants
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Charlotte Page on
Hello everyone, New to LEED, and I have been trying to figure out who determines what is native and what is adaptive? Need to put a list together for the project that I am working on.
Lighting load synergy in EAp2 and EAc1.2
CI-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?
Lighting Load synergy EAp2 and EAc1.2
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?
beginner question about site area to be treated
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Patricia Weber on
hi there, here's what will probably be an easy question for you but is stumping me, as this is my first time documenting this credit.
Differential Pressure Test
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Michael Smithing on
We've conducted the differential pressure test and the average is around 7 pa. We've had the contractor test the room and report the results on the LEEDUser form.
The owner buys the energy
CI-2009 EAc4:Green Powerposted by Mathilda Jonsson on
Hi all In my LEED CI project the tenant are sub metering their energy usage and are then paying the building the owner for the amount of energy used.
Attached building
CS-2009 EAp2:Minimum Energy Performanceposted by Therese Malm on
There is an attached building to the building we simulate. Should thiis attached building be simulated in the proposed and baseline building or should it be exluded?
Change in Ownership affecting Green Power Contract?
CS-2009 EAc6:Green Powerposted by Joern Drosten on
Dear all, the company which does the site development of our project has entered a two-year power contract (100 % green power).
MR Credits on Loe-Emitting Materials
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Greengrade User on
Does this require testing after it is in place?