Forum quick links
LEED certification separate or whole?
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Qiang Zhang on
A campus have several projects, and 4 of the projects are connected with sidewalk/spatial corridors, seems a whole building, but they have different functions, in this situation, can we still certi
Bicycle Network
Pilot-Credits PC30:Alternative Transportationposted by Vanessa Cardona on
For projects not located in urban areas, has anyone had difficulty identifying streets or finding maps with bicycle lanes indicated?
EPA Test Method 24 and SCAQMD 1113
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Catherine Blakemore on
If a product is testing using US EPA Method 24 (ASTM D 2369, the Standard Test Method for Volatile Content of Coatings) is that an acceptable testing equivalent to SCAQMD 1113.
LOCAL ORDINANCE LEED CERTIFICATION REQUIREMENTS
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Daniel Joseph on
Dear LEEDusers, Im currently working on a Medical Office Building that we are currently pursuing certification under the Core and Shell rating system.
Is LEED for Retail the right choice?
NC-2009 PIf1:Minimum Program Requirementsposted by Lauren Sparandara on
My project's retail is owned by the University Campus as opposed to outside vendors. Can we still use LEED for Retail? Thanks!
APPEAL DESIGN CREDITS AFTER CONSTRUCTION PRELIMINARY REVIEW
posted by Jose Antonio Kovacevic on
In a Core and Shell building we are finishing the construction process and we have obtained 47 points in the design stage. The goal of the owner is a GOLD certification,we must have at least 13 poi
Energy modelling for typical stadiums
NC-2009 EAp2:Minimum Energy Performanceposted by Lolita Wu on
We are evaluating the feasibility of LEED certification for a stadium. Is ASHRAE Standard 90.1 applicable for a stadium?
ASHRAE 90.1 baseline HVAC system type selection
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
In a building where a significant portion is "unconditioned", the baseline HVAC system type selected from table G.3.1.1.A shall be based on total area or on conditioned area only?
weight, volume, or cost?
NC-2009 MRc7:Certified Woodposted by Adrienn Gelesz on
Based on your experience, which is the most common approach for determining wood percentages in an assembly? Which is the easiest for the vendors to calculate?
Natural Ventilation vs. Exhaust Rates
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Jan Hesse on
We are working on an office project that is natural ventilated in whole. All occupied spaces fullfill the requirements for natural ventilation of ASHRAE 62.1.