Tenant Submetering
CI-2009 EAc3:Measurement and Verificationposted by sompoche sirichote on
I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora
Cooling EIR as the only evidence of PFan modeled separately?
NC-2009 EAp2:Minimum Energy Performanceposted by Ting Wang on
We received an comment review about a system 6 (PVAV w/ PFP boxes) baseline model in eQuest: The SV-A reports indicates that the cooling efficiencies for the HVAC systems were not correctly reflect
Direct grid feed in - eligible?
NC-2009 EAc2:On-Site Renewable Energyposted by Jens Apel on
After reading all threads and LI I am still unsure if PV production directly fed into the grid is eligible for EAc2. Consider a PV array owned and operated by the building / LEED project owner whic
Credit language
Pilot-Credits PC14:Walkable Streetsposted by Michael Beattie on
HI all, The language of this pilot credit and this discussion raises questions that I'd love to get clarification on: Is the required distance between street trees 45 feet (15 meters) or 450 feet
Pilot credit
ND-v2009 IDc1:Innovation and exemplary performanceposted by Noriko Nagazumi on
Hi, We are seeking oppotunity to achieve a point via pilot credit. We can find only one pilot credit applicable to ND in the pilot credit library in USGBC web site.
4.3 effic vehicle parking versus 4.4 car pool parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Noriko Nagazumi on
Hi, In a project where preferred parking are the parking spaces closest to the main entrance, is there any order when SSc4.3 placing low emitting and fuel efficient vehicles preferred parking and
Industrial zones
NC-2009 SSc1:Site Selectionposted by Emre Yöntem on
Hi all, Is there any exception for the areas divided for particular activity like industrial zones? Are these areas also undeveloped? Thanks in advance.
CxA
NC-2009 EAc3:Enhanced Commissioningposted by Jamal Uddin on
If the task of CxA complete in design phase now for my building but the building construction will be finished totally after 4/5 years from now.
Determining the Owner/Tenant % Controlled for ACP
CS-2009 EAc1:Optimize Energy Performanceposted by Joseph Petty on
I have a C&S medical office building that is 88% tenant space (by area) and am trying to figure out how to correctly document the owner/tenant % of the building energy cost for the Core and She
Autocontrol / metering urinals - 12sec or optional?
CS-2009 WEc3:Water Use Reductionposted by Petr Vogel on
Dear all, when calculating proposed case water consumption budget for public autocontrol / metering urinals…is there the same requirement like the 12sec requirement for public autocontrol / meteri