Forum quick links
EA prereq documentation
NC-2009 EAp2:Minimum Energy Performanceposted by Mike Decoster on
We have documented EA prereq 2. We are using LEED NC v 2009 and we are using form version 4. We have filled in all the required information with the exception of the Target Finder.
Mixed Ventilation
NC-2009 IEQc2:Increased Ventilationposted by Paula Hernandez on
Hello Everybody, I have this Project, which main activity is store and move packages.
LEEDUser vs. USGBC
Pilot-Credits PC34:Design for Adaptabilityposted by Nicholas Swinehart on
There are discrepancies between the LEEDUser and USGBC requirements for this pilot credit.
MPR 2 - Separate Ownership
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Jonathan Weiss on
I am curious about the separate function AND ownership requirement for an addition to a non-certified building.
Partial Load Calculations & Fan Sizing
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Nick Chiarelli on
Hello, This project is 12 floors served by base building AHU's, pumps, chillers, etc.
Requirements clarification
Healthcare-v2009 IEQc2:Acoustic environmentposted by BABAR MEHMOOD on
What i understand from this credit is it has 2 portions. On is regarding the sound isolation alongwith the room noise and additional points will be given if comply with the acoustical finishes.
2 options, Flush out and Air testing
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Yazmin Trueba on
230k School, Tight Schedule, Path 1 Flushout before occupancy, Per Phases, 21 Air Handler Units / Zones, 6 areas of Flushout durations from 99 days to 30 days. My questions: 1.
CHANGING FIXTURES TO MEET PREREQUISITE
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Daniel Rohe on
I have a building that was built before 1993 with airators that are 2.2. Inorder to meet the prequisite I have to change the Airators to .5.
Occupancy for the calculations
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patricia Fuertes on
Good afternoon, I have a question about the occupancy I have to take into account for the minimum air flow calculations.
Blower Door Testing on 36 Story Multi-Family
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Rachel Shepherd on
I am working on a project where blower door testing is required for a multi-family facility. The building is 36 stories tall with a mechanical penthouse.