Lease Agreement an option to comply with the credit requirements

NC-2009 PIf4:Schedule and Overview Documents
posted by  Katherine Ann Resurreccion  on 

Hi, We are currently documenting the requirements for PIf4 and our option in order to comply is to provide a Tenant/Lease Agreement for certain credits.

1
Mon Jul 1, 2013, 8:07 am

Other tenant space is unoccupied...

CI-2009 SSc1:Site Selection
posted by  Kerrie Racicot  on 

Our project space occupies a majority of the building, however the only other tenant space is unoccupied. Is Path 7 - Light Pollution Reduction possible?

1
Thu Mar 21, 2013, 8:27 pm

"Peak occupants" and "Full-time equivalent (FTE) occupants"

NC-2009 PIf3:Occupant and Usage Data
posted by  Marcio Alberto Casado Pereira  on 

We have a multiple building situation. The changing rooms of one of the buldings (named "P10") serves to the population of the entire campus.

1
Thu Mar 21, 2013, 8:24 pm

Hvac - Baseline System Descriptions

NC-2009 EAp2:Minimum Energy Performance
posted by  Marina Andrade  on 

Hi, I am trying to classify an HVAC System (for the Baseline model) of 3731 m2 distribuited on 6 conditioned floors (HealthCare facilities). Checking the Table G3.1.A (Ashrae 90.1-2007) apparentl

1
Wed Mar 20, 2013, 6:41 pm

USGBC as Code Officials

General forums
posted by  Hernando Miranda  on 

The USGBC has been a code and rules enforcement organization for some time now.

0

Dual Flow faucet

NC-2009 WEc3:Water Use Reduction
posted by  mariela garate  on 

The water use of dual flow faucets that has two positions, would be a weighted average of both? 1º: 1,58 gpm 2º: 2,37 gpm =1,97 gpm? As a dual flush toilet water use is calculated with 2 low+1ful

0

LEED IEQ8.1: how to add simulation results for different floor ?

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Olivier Brouard  on 

Hi ! Running daylighting analysis on a 4 stories building, assuming 3 floors have more than 75% of natural daylight between 10fc-500fc in regularly occupied space, whereas the last floor has less

1
Thu Mar 21, 2013, 1:09 pm

Permanent Monitoring System = Surveys?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Lisa Milano  on 

I was very surprised to see the following statement in the Missing Manual and in the above Bird's Eye View section, "LEED defines a permanent monitoring system as having regular, repeated comfort s

1
Wed Mar 20, 2013, 11:01 pm

Project Owner/MPR

ND-v2009 PIf1:Development Program and Site Type
posted by  Michael Smithing  on 

We are planning on pursuing ND certification of a large site which is has multiple owners (single purpose vehicles all under common control.) The client's is pursuing certification to qualify for

1
Thu Mar 21, 2013, 2:57 pm

Exemplary Peformance

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Janene Bolt  on 

Our project is a major renovation to a historic building, and preliminary calcs are showing that we are reusing 99.1% of existing walls/floors/roof.

1
Thu Mar 21, 2013, 2:05 pm