Forum quick links
Minimum Acoustical Performance in Naturally Ventilated Classroom
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by cristina algaze beato on
Most of our core learning spaces are naturally ventilated.
Recertification Tracking
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Robin Obaugh on
I have a question concerning Part 1 of the form and how it is to be used for a property that achieved this credit and is in it's 2nd performance period. "Existing Equipment Log": Should the equip
Can you earn SSc1 opt 2 RP credits if only pursing SSc1 opt 1?
CI-2009 RPc1:Regional Priorityposted by Misc User on
We are building a LEED CI space in a LEED EB building and earning 5 points under SSc1 option 1. We qualify for one of the option 2 credits--Brownfield Redevelopment--which is also a RP credit.
Drainage Pipe Capacity
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jatuwat Varodompun on
Can we count the capacity of underground drainage pipes as the retention capacity? The pipe capacity will then add to the stormwater retention capacity.
Defining the building type
CS-2009 EAc1:Optimize Energy Performanceposted by Rosana Correa on
Hi, I have a 6 floors/2000 m² nonresidential building, and I am not sure about the system it should be. Area or number of floors is more relevant when choosing a system?
SSp1 - Licensed Professional Exemption Tab
posted by Joseph Greene on
Credit SSp1 includes a LPE Option for a licensed civil engineer. Can anyone assist us in changing the signature? Once we checked the box it was grayed out and became read-only.
Modeling Tenant Fit-out in NC
NC-2009 EAp2:Minimum Energy Performanceposted by Kai Starn on
I have a LEED-NC residential high-rise project that contains about 30% commercial space to be fit-out by a future tenant.
Paint grip metal SRI
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Heather Holdridge on
Our project has paint grip metal roof over the structures. We tried to get the SRI value from the manufacturer but could not.
Rainwater Harvesting Calculator
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Erin Holdenried on
Does anybody know of a good rainwater harvesting calculator online anywhere? Most of the ones I have found do not let you adjust enough of the inputs to be useful.
WPC Doors
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Ivan Priatman on
The only wood products that I will be using in a project are wood plastic composite doors with no added urea-formaldehyde resins. Will I be able to comply with the credit? Many thanks.