Forum quick links
Thin Client
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, The owners of the building we are certifying want to evaluate the effects of the thin client (form 150 W/computer to 50W/computer) on EAp2/EAc1.
Conditioned Space
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Consider a space, storage, with no heating, modelled with heating setpoint -50 degC, receives air from a central air handling unit VAV system, where the delivered air is pre-conditioned from Outdoo
Already certified project
posted by soha yamani on
i have a certified project under NC v 2009 it was registered on 5/30/2010 the certified project consist of 1- a building that consist of a ware house zone labour zone and administration zone
Flushout of Nonoccupied Spaces
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Sally Marr on
The 26,000 square foot building that I am working on has several spaces that are not served with supply air by the building's ventilation system, including toilet rooms and mechanical and electrica
Anticipated Review Return Date Question
posted by Kathy Wislocky on
I haven't submitted for review in a very long time. Could someone confirm if the "anticipated return date" after my preliminary review is a hard date or just a recommendation?
green energy contract for another building of the same company
CI-2009 EAc4:Green Powerposted by Adam Targowski on
It turned out that the buidling where our client's office is located has a contract signed with an energy provider that doesn't provide green energy.
Training
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Mélanie Pitre on
We are considering to conduct an audit with in-house staff.
problem with MR Cr2.1 template version 5 at LEED online
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Sofia Otterheim on
Hello we got a problem when we finished uploading and filling information for MR cr 2.1with durable goods of electrical equpiment At the end of template, we clicked the check compliance button,
Thermal Zones
Healthcare-v2009 EAp2:Minimum energy performanceposted by Attiq Rahman on
I am modeling an office building for LEED which will house different tenants that will consists of a dental clinic and medical clinic etc. There are a number of different spaces in the building.
Single ply roof membrane
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Michael E. Edmonds-Bauer on
In a greenroof application, if a single ply roof is use (we called it a "liner"), does it have to comply with the 450 g/L of VOC limit? Techically, it is on top of the building on the outside.