Forum quick links
EPA Number
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Alicia Villanueva on
If one of the product used does not have an EPA Number: are we still eligible for this credit? GH
Multiple Building and On Campus - LEED Online functionality
posted by Tate Walker on
I am considering registering a Veterans Home Campus utilizing Mult Bldg and On Campus. Have the full funtionality issues been resolved? if not when will full functionality be available?
Task Lighting Lamps
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
Do task lighting lamps need to be included in this credit?
Clarification for Conference Room
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by Alexa Stone on
Hi All, For a convention center building where over 90% of the building consists of "multi-occupant spaces" i.e.
HVAC duct insulation adhesive
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Lavanya Veerappa on
Hi, It is a general practice to use Fevicol SR 998 as duct insulation adhesive due to its bonding with the ducting material. However the VOC content of this product is 700 grams per litre.
Project Boundary 2 buildings on site but only 1 certification
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Elke Malleier on
Hi experts, I would appreciate your advice on the follwoing, please. I am unsure to draw the project boundary in situation described below: - Entire project site (including dormitory building) wil
Carpooling and Alternative Vehicle Double counting?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by American University on
How are you supposed to handle carpool trips that also occurred in an alternatively-fueled or fuel efficient vehicle?
Discounted Parking for SSc4.3
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Patrick MacPherson on
It is understood that per SSc4.3 Option 1 within LEED v2009 you can offer discounted parking spaces at a 20% discount for vehicles that are low-emitting and fuel efficient per the referenced standa
ROOF CORRIDORS WITH MULCHING
NC-2009 SSc7.2:Heat Island Effect—Roofposted by RICARDO HERNANDEZ on
I'm pursuing the credit with the 50% of vegetated roof but the landscape architect considered almos 1500 sq ft. of gravel and rocks for corridors, without this 1500 sq. ft.
EAc7 Community Contaminant Prevention - Airborne Releases
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Andrew Gil on
The Online form asks "Does the project have an engine(s) that is 1,000 bhp or greater?" and includes check boxes for both "yes" and "no" responses: Is this credit more like WEc1 wherein you get cre