Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EPA Number

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Alicia Villanueva  on 

If one of the product used does not have an EPA Number: are we still eligible for this credit? GH

1
Wed Feb 13, 2013, 3:49 pm

Multiple Building and On Campus - LEED Online functionality

LEED Guidance for Campuses and Multiple Buildings
posted by  Tate Walker  on 

I am considering registering a Veterans Home Campus utilizing Mult Bldg and On Campus. Have the full funtionality issues been resolved? if not when will full functionality be available?

1
Thu Mar 21, 2013, 4:53 pm

Task Lighting Lamps

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Saju Varghese  on 

Do task lighting lamps need to be included in this credit?

1
Fri Feb 8, 2013, 9:58 pm

Clarification for Conference Room

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Alexa Stone  on 

Hi All, For a convention center building where over 90% of the building consists of "multi-occupant spaces" i.e.

1
Thu Mar 28, 2013, 10:04 pm

HVAC duct insulation adhesive

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Lavanya Veerappa  on 

Hi, It is a general practice to use Fevicol SR 998 as duct insulation adhesive due to its bonding with the ducting material. However the VOC content of this product is 700 grams per litre.

1
Fri Feb 8, 2013, 10:57 am

Project Boundary 2 buildings on site but only 1 certification

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Elke Malleier  on 

Hi experts, I would appreciate your advice on the follwoing, please. I am unsure to draw the project boundary in situation described below: - Entire project site (including dormitory building) wil

1
Thu Mar 21, 2013, 2:27 pm

Carpooling and Alternative Vehicle Double counting?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  American University  on 

How are you supposed to handle carpool trips that also occurred in an alternatively-fueled or fuel efficient vehicle?

1
Fri Feb 8, 2013, 9:16 pm

Discounted Parking for SSc4.3

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Patrick MacPherson  on 

It is understood that per SSc4.3 Option 1 within LEED v2009 you can offer discounted parking spaces at a 20% discount for vehicles that are low-emitting and fuel efficient per the referenced standa

1
Mon Feb 11, 2013, 2:27 pm

ROOF CORRIDORS WITH MULCHING

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  RICARDO HERNANDEZ  on 

I'm pursuing the credit with the 50% of vegetated roof but the landscape architect considered almos 1500 sq ft. of gravel and rocks for corridors, without this 1500 sq. ft.

1
Thu Mar 21, 2013, 2:43 pm

EAc7 Community Contaminant Prevention - Airborne Releases

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  Andrew Gil  on 

The Online form asks "Does the project have an engine(s) that is 1,000 bhp or greater?" and includes check boxes for both "yes" and "no" responses: Is this credit more like WEc1 wherein you get cre

0