Forum quick links
Minimum Energy Efficiency in Historic Buildings
ND-v2009 GIBc2:Building energy efficiencyposted by Anne Tambling on
We have just started on a residential development in a historic district with the conversion of an existing historic building with landmark status into condominiums and the construction of 15 new h
Exemp. Perf. Design Credits Submitted During Construction Review
NC-2009 IDc1:Innovation in Designposted by Ralph Bicknese on
Has anyone successfully submitted already reviewed (and anticipated) Design Credits that achieved exemplary performance status during the Construction Review for an innovation point?
Chiller Efficiency: With Errata?
NC-2009 EAp2:Minimum Energy Performanceposted by Johannes Hopf on
Hello everyone, The reference guide refers to ASHRAE 90.1-2007 with errata without addenda. Now the Minimum Chiller Efficiency for Water Chilling Packages changed. Original Table 6.8.1C: e.g.
illumination metering with a photovoltaic system?
NC-2009 EAc5:Measurement and Verificationposted by Tatiana Machado on
A project illumination system is controlled by a photovoltaic system.
Can we switch methods to achieve SSc5 after initial review?
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Ryan Nelson on
We recently recieved our project review for a property. Initially, we attempted to claim a retention pond as an on-site protected land.
Tridimensional LPB??
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Marcio Alberto Casado Pereira on
Hi all, We are workign on this subway station and it has ramps that cgoes across the streets.
Post Occupancy Survey for LEED CS
NC-2009 IDc1:Innovation in Designposted by Phil Meyer on
Has anyone heard of doing a Post-Occupancy Survey/Evaluation, in regards to IEQ, as an ID for LEED CS?
Core and Shell Renovation/Addition Parking not in Scope
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Ed Clark on
We are looking at a Core and Shell Renovation/Addition. We will pursue 2009 C&S and EBOM afterwards.
Is data being gathered and used?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Bill Swanson on
We commit to allowing USGBC to have access to our energy and water meter data from the Utilities. Does USGBC follow up and collect this building data for all v2009 projects?
OPR Never Produced
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ed Clark on
I was added to the project after construction due to staffing changes. An OPR was never produced. The design meets and exceeds the owner's goals and commissioning has been completed.