posted by  Bill Swanson  on 

10/1/2012 ID# 10236 MPR/Prerequisite/Credit: SSc8: Light Pollution Reduction Primary Rating System: New Construction v2009 Ruling All instances in the credit language of "LEED project boundary" or

0

Fire Stopping Sealants

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Mariah Grife  on 

I am currently tracking the LEED Data for a construction project I am on.

1
Mon Jan 14, 2013, 5:01 pm

street network

Pilot-Credits PC9:Street Network
posted by  Sara Aschliman  on 

It appears that our project will qualify for this point, and I do believe that the spirit of the credit positively reinforces the walkability of our neighborhood site as the increased intersections

0

MPR 6 - Energy Star Portfolio Manager not for future buildings?

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Cassandra Kail  on 

I am currently working on a LEED-NC 2009 Multiple Building Project. We are having a problem with MPR 6; commit to showing whole-building energy and water use data.

1
Mon Jan 14, 2013, 7:08 pm

definition of greenfield for commercial interiors

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Ken Dooley  on 

Hi all, how can a fit-out that is to be certiifed by commercial interiors be a "greenfield development" ? Surely once the core and shell project is completed, the fit-out is on a previously develop

1
Mon Jan 21, 2013, 3:42 pm

Alternative Compliance Path Case 1: Lease Document

CI-2009 EAc3:Measurement and Verification
posted by  Carolina Acevedo  on 

Is there an alternative compliance approach to this credit? My project falls under Case 1 (less than 75% of the project space), but my client owns the floors hence the lack of a lease agreement.

1
Tue Jan 15, 2013, 6:52 pm

Undefined Outdoor Spaces

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Luis Miguel Diazgranados  on 

Greetings Everyone I'm working on a office project with outdoor spaces within the LEED Boundary. The project's construction phase is almost finished.

1
Fri Mar 22, 2013, 4:41 am

Material-Efficient Framing based on LEED-Homes?

NC-2009 IDc1:Innovation in Design
posted by  Heather DeGrella  on 

Has anyone tried an ID point for NC, based on the Material-Efficient Framing credit in LEED for Homes?

0

Determining Baseline for Mixed Use

NC-2009 EAp2:Minimum Energy Performance
posted by  Jason Biondi  on 

Hi all, thanks for the forum. The building is 8 stories, 3 flrs office, 3 floors parking, 1 retail, 1 resturaunt. Is it accepabable to use the 5 story building baseline schedule if the parking gara

1
Tue Jan 15, 2013, 10:46 pm

Water deduct meters acceptable as submeter?

EBOM-2009 WEc1:Water Performance Measurement
posted by  Ryan Nelson  on 

Could a water deduct meter be used as a working submeter assuming it properly segregates systems such as the cooling tower or irrigation?

1
Wed Jan 30, 2013, 6:17 pm