Forum quick links
WEp1 and occupancy definition
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by R Jones on
I have a fit out project which is occupying a new core and shell building.
Infiltration diff between proposed/baseline models is possible?
CS-2009 EAc1:Optimize Energy Performanceposted by CHRISTOPHE MATHIEU on
I’m modeling a building for C&S in France. Normally in my baseline and proposed models I put the same infiltration (n50 = 0.14 ach) for both buildings.
Bicycle Network
Pilot-Credits PC30:Alternative Transportationposted by Nate Steeber on
I guess there are a few clarifications necessary for me to see if the project meets. It says that 'Homes' is an applicable rating system - does this apply to single family - I would assume yes.
MET Rate for Retail Space
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Omer Moltay on
What MET rate would you assume for the ASHRAE-55 compliance for retail areas (ie. supermarket, clothes retail)?
Calculating CO2 Concentrations in a Zone
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Marcio Alberto Casado Pereira on
Hi! I'm finishing a project and must indicate the levels to be configured in ppm CO2 sensor environments. As an example, I have a training room with 8 people and an area of 497.29 sf.
concession area window/roll up door exposed to the outside
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by renee jimenez on
I’m working on a facility that has several concession areas that are enclosed with a solid roll up door that are open to the outside when occupied. The space is occupied only during event.
Salvaged and Regional Materials
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Summer Gorder on
For materials that were removed during demo and then re-used during construction, can you count these materials as salvaged as well as regional, meaning can you count the cost twice?
Multi-family - Energy Disclosure Requirement
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Jeremy Kuhre on
Courtney, we have a similar situation to yours in that we do not have access to whole building utility data. We are currently in the process of certifying several large multi-family projects under
Modified AHU
CI-2009 EAp2:Minimum Energy Performanceposted by Silvia Ruiz on
Hi, If an AHU (initially outside of the scope of work) had to be modified in order to comply with the ventilation requirements of Standard 62.1-2007, does it have to comply with the requirements
non certifiable building
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by renee jimenez on
what is the definition of a non-LEED-certifiable building? does it mean your not going to attempt to certify them or that they dont qualify/meet minimum requirements?