NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Carrie Laurendine on
Owner would prefer if the sign did not have the "noisy" icon of a "ghostbusters" red circle with line through it and a cigarette.
US Military Installation Abroad
Schools-2009 SSc1:Site Selectionposted by Denise Shimabukuro on
If the project is located in a foreign country on a US Military Installation, is this considered to be within the US? Technically, the APO Zipcode is California.
Mandatory provision 6.4.1.1 Equipment efficiency.
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.
SF least toxic pesticide list
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Manasi Kulkarni on
Hi All, Our client is using pesticides which are neither included in SF pesticide list nor active ingredients are found in that list.
compliance with ASHRAE 90.1 2007
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007.
Definition of basic services
NC-2009 SSc2:Development Density and Community Connectivityposted by Marcio Alberto Casado Pereira on
Dear all, do the following services count for this credit: - gas station - parking lot structure - vehicle repair shop - football stadium - acquatic park - woodshop Thanks!
documentation
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Adrienn Gelesz on
Hi! Were in a beginning of documenting ESC measures, and we have to define what the constractor should provide as evidence.
Existing Parking
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Dina Ammar on
We are constructing a new Core and Shell building on an existing underground parking . Should the parking be included in the project LEED boundary?
"total gross square footage / gross floor area"
NC-2009 PIf2:Project Summary Detailsposted by Carrie Laurendine on
LEED-NC PIf2 - second row prompts user to fill out "total gross square footage / gross floor area" im confused what they are asking for. and also not sure where to look to research this.
green roof that is also accessible
NC-2009 PIf2:Project Summary Detailsposted by Carrie Laurendine on
building has a green roof that is also a courtyard. originally, another staff member excluded this area from total square footage. to me this seems incorrect?