Sunset Date & Multiple Buildings
posted by Cassandra Kail on
I'm working on a project that has a Master Site and 2 buildings, Bldg A and Bldg B. Bldg A is scheduled to be finished and occupied 2 years before the Master Site and Bldg B are finished.
Design Submittal
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Gaston Viau on
This credit cannot be submitted on the deign phase if we choose option 3 (measurement) right? Thanks in advance for your time.
Combinable Paths to points
NC-2009 IDc1:Innovation in Designposted by Gaston Viau on
Is it possible to combine the paths? In example: Is it possible to get 3 points for 3 achieved exemplary performances + 1 point for Educational Program + 1 point for an achieved Pilot Credit = 5 P
Collection of hazardous waste.
ND-v2009 GIBc16:Solid waste management infrastructureposted by Martine Desbois on
Hi Eliot, the jurisdiction in which the project is located does not collect hazardous waste from the site but provides information on where the hazardous wastes can be deposited in the area.
IEQ p1 options
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ramon Gomez on
Hi, we are filling the form for the IEQp1 and we have a doubt on what to choose between mechanically ventilated or mechanically conditioned, since we consider our areas mech.
outdoor delivery rates in a naturally ventilated space
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Vera Voropaeva on
After receiving the project's review we are asked to provide outdoor delivery rates.
Appealing period.
NC-2009 PIf4:Schedule and Overview Documentsposted by Jatuwat Varodompun on
Does the announced holidays of GBCI from 25 feb 2012-1 fan 2013 count as holidays and will not be included in 25 bussiness days of appealing preriod? thanks
How to handle offsite area owned by building owner
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Aron Weis on
The credit form is asking for a contract with the owner of the off-site property.
conflicting info on total materials cost
NC-2009 MRc4:Recycled Contentposted by Carrie Laurendine on
form im filling out says total material cost for csi divisions 3-10, as well as many of the divisions from 31. ive heard others say 31 isn't necessary. just 3-10. whats the consensus?
LI #2500/#10209 Shower Requirements for Mixed Use Buildings
posted by Michelle Rosenberger on
This section is a great idea, thanks.