Forum quick links
Option 1
Schools-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Emily Catacchio on
I'm having a hard time understanding the "1 designated carpool drop-off area for low-emitting and fuel-efficient vehicles" in Option 1.
active control for private offices
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mark Taake on
I'm beginning to think that in many cases the private office active control requirement can be made to work for a VAV system only if each office has a separate motorized damper in the supply duct s
HVAC System Type for heating only warehouse
CS-2009 EAc1:Optimize Energy Performanceposted by Matt Short on
After reading through the forum I have not found a response that specifically addresses a CS building who's future tenant finishout of office and warehouse space is yet to be designed but has the f
Number of IAQ Sampling Locations in Apartment Building?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Bill Kilpatrick on
I would appreciate advice on the number of sampling locations needed for LEED Testing per IEQ Credit 3.2 Option 2 in mid-rise Apartment buildings. We follow the sampling rules for commercial build
Communal cycle spaces
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Eszter Gulacsy on
We are currently working on a LEED-CI project, in which there is no cycle storage planned / available within the project area, however, there is ample cycle racks near to the site.
Table IEQc1-2 Outdoor Air Ventilation Rate
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Thomas Hellmann on
According to IEQc1, I am to complete table IEQc1-2 for all systems where 20% or more of the design supply airflow serves non-densely-occupied spaces.
LEED Pilot Credit 13-comment
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Alice Sung on
I appreciated Michael Smithing's clarificationof the defintion of a bicycle "network, " as inclusive of : " residential streets designed for a target speed of 25 mph (40 km/hr) or slower and comme
Fair price for off-site land conservation credits
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Chris Draper on
Does anyone know the basic market price/acre or price/credit for securing contracts on off-site land that meets the SSc5 requirements?
Something might be helpful
posted by Diana Hill on
I had problem that cannot open leed online v3 on my mac for a long time, even though I already have the newest adobe reader version.