Appeal submitting period

General forums
posted by  eirini matsouki  on 

hi there, one of our porjects is been denied a pre-requisite (EAp2) during the final design review and hence the project has entered the appeal process (enetring the 'design appeal review' - within

1
Wed Dec 5, 2012, 9:09 pm

Covered Loading Dock - What is a parking space?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Richard Woodward  on 

We are working on an urban alteration project which extends an existing building to cover an exterior loading dock, enclosing it within the new building.

1
Thu Dec 13, 2012, 9:41 pm

SSC1 Path 5: Heat Island Effect: Roof

CI-2009 SSc1:Site Selection
posted by  Elliot Young  on 

I am working on a project with an existing ballasted roof & am wondering if we could get this credit.

1
Fri Nov 30, 2012, 9:58 pm

Base case system for high equipment loads spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Nandana Kumar  on 

The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft.

1
Tue Dec 4, 2012, 2:42 pm

Water waste

NC-2009 MRc2:Construction Waste Management
posted by  Karim Farah  on 

During coentsruction, a project has a major amount of water waste (more than 50% of the total amount of the waste generated by one production unit), this quantity of water is a result of the produc

1
Mon Dec 10, 2012, 6:07 pm

Tap for bar counter

Retail-CI-v2009 WEp1:Water use reduction
posted by  Eddy Tsang  on 

Should i include the tap for the bar counter in the water use reduction calculation?

1
Thu Dec 13, 2012, 9:10 pm

Process energy

NC-2009 EAp2:Minimum Energy Performance
posted by  Graham Langton  on 

Regarding what is taken as a process energy.

1
Mon Dec 3, 2012, 3:19 pm

Can the CxA be involved in the thermal model of EAp2?

NC-2009 EAc3:Enhanced Commissioning
posted by  Maya Karkour  on 

Dear All, We are consulting for a large LEED-NC tower. The thermal model for EAp2 / EAc1 were undertaken by a company independant from the design team.

1
Mon Dec 3, 2012, 7:43 pm

GIBp1

ND-v2009 GIBc1:Certified green buildings
posted by  Nader NAKIB  on 

Will a BREEAM certified building in an ND project count towards LEED GIB prerequisite one?

1
Mon Dec 3, 2012, 2:34 pm

Documentation only for regularly occupied spaces?

CS-2009 IEQc7:Thermal Comfort—Design
posted by  Marco Abdallah  on 

Do we have to provide documentation that the design conditions fall within the ASHRAE 55-2004 just for regularly occupied spaces (e.g.

1
Wed Dec 5, 2012, 1:42 pm