The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft. These high equipment rooms are 24x7 operating. We have modeled baseline case considering PSZ-HP in all these rooms as per G3.1.1b. The other spaces (office spaces) are modeled with VAV-PFP boxes. Is the approach correct?