The project is a 67000 sqft, six floored building. There are rooms with high equipment loads of greater than 20W/sft . The total area of these type of rooms adds up to 14,000 sqft. These high equipment rooms are 24x7 operating. We have modeled baseline case considering PSZ-HP in all these rooms as per G3.1.1b. The other spaces (office spaces) are modeled with VAV-PFP boxes. Is the approach correct?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5909 thumbs up
December 4, 2012 - 9:42 am
Sounds right assuming you have electric heat in the proposed.