Forum quick links
WE 2.2 states, "minimize the
NC-2009 WEc2:Innovative Wastewater Technologiesposted by David Holmes on
WE 2.2 states, "minimize the amount of wastewater conveyed to the municipal system" Can we automatically acheive this Credit by using an onsite Well and Septic system?
Can I use LEED Commercial Interiors
posted by Paul Gammons on
I am working on a project that pursing LEED certification. It is a 2-story building with about 10% being occupied by an existing tenant.
Where is the Special Circumstances Option?
NC-2009 PIf1:Minimum Program Requirementsposted by NA AN on
I got the Agent form signed by the legal department and need to upload to leedonline. They told me to upload under Plf1 using the speical circumstances option.
LEEDuser's MRp2 template
EBOM-2009 MRp2:Solid Waste Management Policyposted by Tristan Roberts on
We have updated the MRp2 template we offer through LEEDuser, adding a mention of mercury-containing lamps. Members can download this in the Documentation Toolkit.
Reporting Recycling
NC-2009 MRc2:Construction Waste Managementposted by Samantha Nourse on
Hi, I am working on the forms for submitting credit MR2 as our project has come to a close.
Form v03 vs v04
NC-2009 MRc4:Recycled Contentposted by Angie Allen on
I am completing the documentation for MRc 4, 5 & 7. Currently, we are working from version 3.0 of the form on LEED Online.
how i need to model that to comply with model actual equipment a
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
There is a fan system that will supply outdoor air for the building, This system is a big injection fan that will supply air to all zones that is completed designed and all the zones that are not c
LEED Compliant Epoxy Floor Coating?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Rebekah Burke on
I see this topic somewhat proposed, but I haven't been able to really see an answer.
Useable Square Footage
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Joel Register on
I am trying to determine what is considered "useable square footage" of a floor plate. The credits refers to both total floor plate and useable square footage. Any ideas?
Response to Preliminary Design Review
posted by SmithGroup BG+LU FW on
We are in the process of responding to the reviewer’s comments in our preliminary design review by adding our comments to the Special Circumstances text box as suggested in another thread on this b