Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Clarification of credit intent and documentation

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Joseph Ford, AIA  on 

I am having difficulty determining if my project can comply with this credit.

1
Wed Dec 12, 2012, 5:19 pm

Kitchen Faucet

CS-2009 WEp1:Water Use Reduction
posted by  ABHIJIT PISAL  on 

The building what we are certifying does not have kitchens or canteen. It only has pantry/breakout areas wherein people have snacks and beverages.

1
Sun Nov 25, 2012, 12:36 am

Per area or Per linear meter requirement?

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Our project proposed to install facade lighting system. They will use a linear tube lamp and mount it to the facade. The lamp consumption is 3.5W per linear foot.

1
Mon Nov 19, 2012, 4:40 pm

VRV unit with Constant Air Volume system

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Srimannarayana NCVK  on 

Hi We are working on a project where the HVAC system is VRV unit.

1
Fri Nov 30, 2012, 4:49 pm

How can the PV array benefit be shared?

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Maria Vasapollo  on 

Our campus has multiple buildings, one of which is going for EBOM now. The PV array is adjacent (in the parking lot). The PV's do have a meter, so we know their output.

1
Fri Nov 23, 2012, 8:38 pm

Shuttle services on base

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sara Heppe  on 

We have a dining hall facility being constructed on a military base.

1
Tue Nov 20, 2012, 1:34 am

Sheetrock - Landill diversion

NC-2009 MRc2:Construction Waste Management
posted by  Mark Cloud  on 

Anyone have any brilliant ideas on what to do with drywall (sheetrock) waste from a major renovation project that we are trying to divert from a landfill but don't have a recycling center within 5

1
Fri Nov 23, 2012, 5:47 am

Naturally Ventilated Space

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Orlin Velinov, PE  on 

We have a tenant renovation project within existing building. Currently the tenant space does not have air conditioning system and is naturally ventilated.

1
Sun Sep 28, 2014, 5:20 am

Relocated Office Equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Elliot Young  on 

I have a large CI project where the client will be moving to a new facility, bringing with them a lot of office equipment they currently are using. Would these credits still be achievable?

1
Mon Nov 19, 2012, 5:10 pm

Waste to energy conversion

Schools-2009 MRc2:Construction Waste Management
posted by  Jesse Stockley  on 

I am trying to select a waste management company. The low bidding company says they have done several leed projects with local contractors.

1
Fri Nov 23, 2012, 12:04 am