Required to ventilate laundry rooms within dwelling units?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maureen Drullard  on 

Looking for consensus on whether it is required for compliance with 62.1 for this prerequisite to provide ventilation for laundry rooms within dwelling units of a high-rise residential tower?

1
Tue Oct 2, 2012, 8:24 pm

Combination Filters - MERV 8 & MERV 11

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  April Ambrose  on 

The MEP on our project has designed the AHUs to have filters in series for the pre-heat coil (MERV 11) and chilled water coil (MERV 8).

1
Mon Oct 1, 2012, 8:12 pm

Views to the inner courtyard?

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Amra Ivojevic  on 

Hello, I would like to know, if I can count the regularly occupied space looking to the inner courtyard? I know it says "direct line of sight to the outdoor environment".

1
Sun Nov 25, 2012, 12:33 am

Use as an innovation credit

Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lamps
posted by  Peter Doo  on 

Has anyone had success in using this as an innovation credit for a health care project (or any project) registered under LEED NC or LEED CI?

1
Tue Oct 2, 2012, 4:40 pm

Use as an Innovation Credit

Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copper
posted by  Peter Doo  on 

Has anyone had success in using this as an innovation credit for a health care project (or any project) registered under LEED NC or LEED CI?

0

Daylight Option 3-Measurement

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Adam Rustige  on 

If I use the daylight measurement method for IEQ 8.1, is there a certain time of day the measurements must be taken? Thanks

1
Wed Oct 3, 2012, 2:45 pm

Will "representative modelling" meet prerequisite/ASHRAE reqs?

CS-2009 EAp2:Minimum Energy Performance
posted by  Ward Miller  on 

The project at hand is ~500,000 sf and contains 4 buildings, each with 2 sub-floors, a ground floor, and between 4 and 11 stories and a district heating source.

1
Thu Oct 4, 2012, 4:11 pm

Core & Shell Lab building

CS-2009 EAc1:Optimize Energy Performance
posted by  Suraj Shah  on 

We are applying for a CS project which primarily will house research labs.

1
Thu Oct 4, 2012, 3:57 pm

Service hot-water system

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the service hot water system for the baseline building.

1
Thu Oct 4, 2012, 3:51 pm

how many time takes a PRECERTIFICATION

General forums
posted by  Ron Dean  on 

hi, I want to know if somebody can tell how many time takes a review for Precertification for a project with more 300,000sf of gross floor area of the project building?

1
Fri Nov 23, 2012, 3:23 pm