Required to ventilate laundry rooms within dwelling units?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maureen Drullard on
Looking for consensus on whether it is required for compliance with 62.1 for this prerequisite to provide ventilation for laundry rooms within dwelling units of a high-rise residential tower?
Combination Filters - MERV 8 & MERV 11
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by April Ambrose on
The MEP on our project has designed the AHUs to have filters in series for the pre-heat coil (MERV 11) and chilled water coil (MERV 8).
Views to the inner courtyard?
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Amra Ivojevic on
Hello, I would like to know, if I can count the regularly occupied space looking to the inner courtyard? I know it says "direct line of sight to the outdoor environment".
Use as an innovation credit
Healthcare-v2009 MRc4.1:PBT source reduction - mercury in lampsposted by Peter Doo on
Has anyone had success in using this as an innovation credit for a health care project (or any project) registered under LEED NC or LEED CI?
Use as an Innovation Credit
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Peter Doo on
Has anyone had success in using this as an innovation credit for a health care project (or any project) registered under LEED NC or LEED CI?
Daylight Option 3-Measurement
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Adam Rustige on
If I use the daylight measurement method for IEQ 8.1, is there a certain time of day the measurements must be taken? Thanks
Will "representative modelling" meet prerequisite/ASHRAE reqs?
CS-2009 EAp2:Minimum Energy Performanceposted by Ward Miller on
The project at hand is ~500,000 sf and contains 4 buildings, each with 2 sub-floors, a ground floor, and between 4 and 11 stories and a district heating source.
Core & Shell Lab building
CS-2009 EAc1:Optimize Energy Performanceposted by Suraj Shah on
We are applying for a CS project which primarily will house research labs.
Service hot-water system
NC-2009 EAp2:Minimum Energy Performanceposted by Luana Bertoletti on
Hi, I have a doubt related to the service hot water system for the baseline building.
how many time takes a PRECERTIFICATION
posted by Ron Dean on
hi, I want to know if somebody can tell how many time takes a review for Precertification for a project with more 300,000sf of gross floor area of the project building?