Forum quick links
Does this mean state owned
posted by David Waggoner on
Does this mean state owned buildings cannot use the LEED rating system? It appears that the executive order only addresses the FSC credit.
Implications of using the AGMBC 2011 Master Site approach
posted by Susan Di Giulio on
Hi, We have assisted in many successful LEED certification processes for a huge (close to a square mile) university campus under LEED-NC v2 & 2.2.
VOCs of materials Defining the Building Envelope
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Andrew Gil on
I've understood the LEED EQc4.1-4.3 requirements, including the reference standards, and have pursued LEED credits for these numerous times over the past 10 years, but have more recently have had p
Completing EAp3 Form Without Equipment Information
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Tony Schafer on
I am having trouble completing the EAp3 form. Since there won't be any cooling equipment installed as part of this C&S project, there is nothing to fill out in table L-2.
Completing WEp1 Form Without Fixtures Specified
CS-2009 WEp1:Water Use Reductionposted by Tony Schafer on
I am having trouble completing the WEp1 form. Since there won't be any fixtures installed as part of this C&S project, there is no fixture schedule to upload.
IEQp1 ASHRAE Section 4 through 7
CI-2009 IEQp1:Minimum IAQ Performanceposted by Diana Hill on
We are working on a office interior design project.
Tenant Submetering connected to BMS?
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Marco Abdallah on
We are pursueing 5.1 Opt. 1 and 5.2 at a CS-project with 10 floors leasable to different tenants.
Pond use outside LEED boundary
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Brian Wolfe on
Is it acceptable to utilize an existing detention pond that is outside the proposed LEED boundary? The stormwater runoff will be piped under the existing road to the pond.
Lighting measurement
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Ron Dean on
good day, I have a project with 14 floors and our project scope is to control the hall and restroom lighting, we can measure and verify their savings. I have a doubt about what I need to measure, m
Time Effort required for LEED ND Consultancy
posted by Mario S. on
Hello everyone, I am curious to know the following: Based on your experience dealing with large projects applying for LEED ND Certification, what would you say is the time effort per stage require