Sealants on Stone Art wall
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jennifer Benedict on
We have a project where a large portion of the stone wall in the lobby will serve as an art installation (stone will be etched & then sealed).
Baseline System parameters with a DES
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Luke Knapp on
I'm designing a building on a college campus that has a DES. We opted to model option 1 for EAc1 (Building Stand-alone scenario).
Parking Capacity - Service/City Vehicles
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by MacKenzie King on
We are working on a city animal shelter that meets the zoning requirements for staff and guest parking on the site.
choosing multiple baseline systems in one building
NC-2009 EAp2:Minimum Energy Performanceposted by ESD Singapore on
Dear organisation, I have a question regarding choosing the correct baseline system. We are working on a Multipurpose building.
Irrigation of greenery out of LEED boundary
EBOM-2009 WEc3:Water Efficient Landscapingposted by Anna Korinkova on
Hi all, our project does sub-meter water for irrigation.
project footprint definiton
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by tanner white on
I have a building with 3 foot overhangs around it.
No minimal local zoning - ITE
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Raphael Iwata on
To achieve credit SSc4.4 we are using ITE study to determine the number of parking lots required.
Non-smoking policy + signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Susie Spivey-Tilson on
We are finishing a LEED CI certification in a building that was LEED NC certified several years ago.
Thanks for the responses so
posted by Michael Zagorski on
Thanks for the responses so far... Please keep them coming!
Sort chiller heat pump in ASHRAE 90.1-2007
CS-2009 EAp2:Minimum Energy Performanceposted by Diego Escalona on
Hello all, I'm participating in a project of a building of 20 floors of offices, of which the first corresponds to shops and entrance hall.