PV in construction phase
CS-2009 EAc2:On-site Renewable Energyposted by Emmanuel Pauwels on
We have filed for design submittal and are moving into construction phase. The client decided to integrate PVs in the project.
IEQc6.2 Thermal Comfort, Design
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Greg Kight on
I'm facing with a question about the room Mean Radiant Temperature (MRT): Is there any spreasheet that calculates the MRT and than the Operating Temperature?
Option 1 - Path 2
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nancy Henderson on
I just had a mechanical engineer point out that the partial flush-out option does not include the requirement to maintain 60 degree temperature and 60% humidity.
Survey done outside Performance Period
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Derek Bernard on
The company in which we are the LEED consultant for conducts an annual survey regarding alternative transportation of its occupants....would a survey done outside the performance period be allowed
Thermal Comfort calculations - without simulation
CI-2009 IEQc7.1:Thermal Comfort—Designposted by Edwin Wealend on
Does anyone know of approved methods to prove this credit without completing a full energy model to simulate indoor conditions, in particular radiant heat? It seems a Psychrometric chart is no lon
Prop 65
posted by Bruce Maine on
Good morning. Armstrong's S-202 adhesive contains 4 percent carbon black. Prop 65 identifies the criteria for carbon black as being "airborne, unbound particles of respirable size".
Assigned Team Role: Leed v2.2
posted by Elle Brown on
How important is it that the person associated with the 'Assigned Team role" in the Claim of Credit Status matches the name on the uploaded credit template Is it necessary for me to go into each cr
Addition to existing building
Schools-2009 EAp2:Minimum Energy Performanceposted by mital patel on
We have a existing building that is LEED Silver and we are adding to same building. New addition is also LEED Silver. Do I need to model both existing and new addition or only new addition.
LEED HC or LEED CI
posted by Bryan Waters on
We have a single floor OR renovation project in a 4 story Hospital building. Can it be pursued via LEED for Commercial Interiors or do we need to puruse via LEED for Healthcare?
Major Renovation of an Existing Building - To lease
posted by Paola Figueiredo on
We are dealing with this situation; Our future client wants to renovate (envelope modifications and HVAC renovationan) an existing building but he will not occupy the building; on the contrary he w