Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

PI form 1 Assigning Mixed Use Acreage

General forums
posted by  Carly Ruggieri  on 

The PIf1 table PIf1-2 is throwing me off. The only options for mixed use are to provide how many acres are assigned to residential and how many acres are assigned to non-residential.

1
Tue Jul 17, 2012, 1:33 pm

PC5 still available?

Pilot-Credits PC5:Preliminary Integrative Project Planning & Design
posted by  Eeshoo Rehani  on 

Hello, Am I still allowed to submit PC5? I have a registration confirmation from Nov 2010 and survey completion confirmation in Sept 2011.

1
Tue Aug 28, 2012, 7:10 pm

Adhesive for insulation instalation

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Joanna Bloniewska  on 

How would you qualify an adhesive for insulation instalation? I am not sure which VOC limit is the most appropriate.

1
Tue Jul 17, 2012, 8:30 pm

M&V period for LEED 2009 C&S projects for EAc5.1 + EAc5.2

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Philip Herriges  on 

The LEED reference guide is very particular in the language that they use to describe the intent and stragegies for EAc5.1 and 5.2 for C&S as being distinct from NC & Schools. For NC&

1
Tue Jul 17, 2012, 4:26 pm

Furniture included?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  severine secret  on 

Using LEED NC 2009, do we need to include furniture items, such as workstations, task chairs and their related components as required for IEQ.45 in LEED CI requirements?

1
Tue Jul 17, 2012, 5:02 pm

Two Year HVAC Electricity Use

CI-2009 EAc4:Green Power
posted by  Joseph Greene  on 

Our LEED project occupies 30% of the total building floor area. The energy model modeled the entire building due to a central boiler and condenser water plant.

1
Fri Aug 31, 2012, 2:10 pm

sanitary installations within tenant fit-out

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michael Haugeneder  on 

Hello all, Our current core&shell project does not include sanitary installations, which will only be built at tenant fit-out stage.

1
Fri Jul 27, 2012, 9:24 am

certification boundary

General forums
posted by  Michael Haugeneder  on 

Hello, I would like to ask some questions about the certification boundary. 1. A project of mixed use (retail+offices and hotel) is being certificated within 5 floors.

1
Thu Oct 4, 2012, 4:31 pm

natural ventilation in underground parking?

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Michael Haugeneder  on 

Hello, is it possible to aim the credit IEQc5 if a project doesn't have a mechanical ventilation in the underground parking (UP)?

1
Sat Sep 1, 2012, 7:49 pm

single stream recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Adam Targowski  on 

Will the requirements of this prerequisite be complied with only by having a waste storage room for the whole building with one container for a single stream recycling (that will accommodate all fi

1
Wed Jul 18, 2012, 4:30 pm