Hello, I would like to ask some questions about the certification boundary. 1. A project of mixed use (retail+offices and hotel) is being certificated within 5 floors. The upper floors (hotel use) is excluded from the certification. How do I treat the boundary? 2. Same project: in the groundfloor a part of the lobby belongs to the hotel part, which is not included in the certification. Is it possible to exlude this one room from the certification? 3. A part of a building in an office complex is exluded from the certification. This time the separation is vertically. How do I treat the boundary?