Treated wastewater definition.

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Diaa Madkour  on 

Hi, working on an office building project, we r pursuing this credit through option 2 : "Treat 50% of wastewater on-site...etc." Through the design Preliminary Review we received a comment stating

1
Thu Aug 2, 2012, 3:51 pm

PTACs as Proposed system?

NC-2009 EAc1:Optimize Energy Performance
posted by  David Mirabile  on 

We are looking into a design-build project of a hotel where the owner is requiring in-room PTAC units.

1
Wed Jul 25, 2012, 8:26 pm

Do we need a computer

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  Maggie Sarhadi  on 

Do we need a computer software to calculate the PMV/ for EQ7.1

1
Tue Jul 31, 2012, 3:43 pm

Open Office Space Requirements

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sherri von Wolfe  on 

I am confused about multi-occupancy lighting requirements for arena office spaces. This is a research lab project on a university campus.

1
Wed Jul 11, 2012, 1:16 am

Excluding regularly occupied areas

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Alicia Villanueva  on 

We have some projects in which regularly occupied spaces are designed with no-windows because of client's requirements. These are process areas (a kitchen and a laboratory).

1
Wed Jul 11, 2012, 5:15 pm

Whole Building LCA as Innovation in Design point?

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Alexandra Ramsden  on 

Two questions: 1) Is it acceptable to submit this as an ID point, outside of the pilot process?

1
Thu Jul 12, 2012, 2:39 pm

Guard house's ventilation

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Florian Schmidtchen  on 

Hallo all, We have a project in one Asian Country, where the Guard house (Gate house) is using a split type unit to condition the room, without mechanical fresh air intake.

1
Wed Jul 18, 2012, 1:05 am

Using only 2 splits (with R-410).

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Lorena Moscoso  on 

It is used in a project two HVAC systems (Split) in two areas of approximately 22.82 square feet, the total project area measures 27,857 square feet.

1
Tue Jul 17, 2012, 1:15 pm

Off-site preservation requirements

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Jessica Blint  on 

My company currently has an off-site preservation area that we already maintain for a previous project. My question is: to fulfill this credit do we have to have a NEW off-site area?

1
Mon Sep 3, 2012, 12:52 am

Partition height at 46"

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Susan M. Kaplan  on 

Herman Miller has given me a diagram showing that 46" high partitions are ok for achieving this credit as long as there is a direct line of sight (not on the horizontal) at 42".

1
Tue Jul 24, 2012, 5:28 am