Treated wastewater definition.
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Diaa Madkour on
Hi, working on an office building project, we r pursuing this credit through option 2 : "Treat 50% of wastewater on-site...etc." Through the design Preliminary Review we received a comment stating
PTACs as Proposed system?
NC-2009 EAc1:Optimize Energy Performanceposted by David Mirabile on
We are looking into a design-build project of a hotel where the owner is requiring in-room PTAC units.
Do we need a computer
CI-2009 IEQc7.1:Thermal Comfort—Designposted by Maggie Sarhadi on
Do we need a computer software to calculate the PMV/ for EQ7.1
Open Office Space Requirements
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sherri von Wolfe on
I am confused about multi-occupancy lighting requirements for arena office spaces. This is a research lab project on a university campus.
Excluding regularly occupied areas
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Alicia Villanueva on
We have some projects in which regularly occupied spaces are designed with no-windows because of client's requirements. These are process areas (a kitchen and a laboratory).
Whole Building LCA as Innovation in Design point?
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Alexandra Ramsden on
Two questions: 1) Is it acceptable to submit this as an ID point, outside of the pilot process?
Guard house's ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Florian Schmidtchen on
Hallo all, We have a project in one Asian Country, where the Guard house (Gate house) is using a split type unit to condition the room, without mechanical fresh air intake.
Using only 2 splits (with R-410).
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lorena Moscoso on
It is used in a project two HVAC systems (Split) in two areas of approximately 22.82 square feet, the total project area measures 27,857 square feet.
Off-site preservation requirements
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Jessica Blint on
My company currently has an off-site preservation area that we already maintain for a previous project. My question is: to fulfill this credit do we have to have a NEW off-site area?
Partition height at 46"
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Susan M. Kaplan on
Herman Miller has given me a diagram showing that 46" high partitions are ok for achieving this credit as long as there is a direct line of sight (not on the horizontal) at 42".