CI or Schools rating system?
posted by Melissa Wrolstad on
I have a School project that is approximately 2 floors of a 4 floor building. USGBC seems pretty adamant that all School projects use the Schools rating system.
Food Waste
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Elizabeth Crenshaw Hammitt on
It looks like project teams must account for Food Waste during the Performance period.
GSF for Master Site?
posted by Erin Holdenried on
I have a new campus project where two of the seven buildings are getting certified. So, we have a Master Site registered and two individual building registrations.
Laundry drain water
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Wei Jiang on
Can laundry drain water be considered as non-potable water source for the credit compliance through Option 2?
Calculating extent of 'Previously Developed Sites'
posted by Ilan Guest on
Hi Leeders, Option 1a for Infill Site determination stipulates the following: "At least 75% of [the project site] boundary borders parcels that individually are at least 50% previously developed,
location info source
CI-2009 MRc5:Regional Materialsposted by Daniela Castro Salgado on
Very simple question: What should I write in the "Location Info Source" column of the template: the location of manufacture extraction, the info source or the location of the info source? Thanks!!
WEp1 & c3 lav fixtures
CS-2009 WEp1:Water Use Reductionposted by charles bell on
We are employing 0.5 gpm lav fixtures with sensors and timed cut off at 10 seconds. Can we factor those to 0.125 gpm because the average use will be say 20 seconds?
Complex credit compliance?
NC-2009 EAp2:Minimum Energy Performanceposted by Kath Williams on
Project location: National Park Project Scope: Relocation of historic building Designation: Retains SHPO designation MR Credit 2: CIRs state relocation results in contributing to Material Reuse cr
Partial tenant occupancy with no core water fixtures
CS-2009 WEp1:Water Use Reductionposted by Laurent Kanago on
I am working on a project where there are no core spaces and all of the fixtures will be provided by the tenants.
Documenting assemblies under MRc5 Regional Materials
CI-2009 MRc5:Regional Materialsposted by Mark Krejcarek on
See Techinical advice from USGBC.