Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

CI or Schools rating system?

LEED Rating System Selection
posted by  Melissa Wrolstad  on 

I have a School project that is approximately 2 floors of a 4 floor building. USGBC seems pretty adamant that all School projects use the Schools rating system.

1
Mon Jul 2, 2012, 12:25 am

Food Waste

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Elizabeth Crenshaw Hammitt   on 

It looks like project teams must account for Food Waste during the Performance period.

1
Mon Sep 3, 2012, 10:42 pm

GSF for Master Site?

LEED Guidance for Campuses and Multiple Buildings
posted by  Erin Holdenried  on 

I have a new campus project where two of the seven buildings are getting certified. So, we have a Master Site registered and two individual building registrations.

1
Thu Jun 21, 2012, 11:47 pm

Laundry drain water

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Wei Jiang  on 

Can laundry drain water be considered as non-potable water source for the credit compliance through Option 2?

0

Calculating extent of 'Previously Developed Sites'

General forums
posted by  Ilan Guest  on 

Hi Leeders, Option 1a for Infill Site determination stipulates the following: "At least 75% of [the project site] boundary borders parcels that individually are at least 50% previously developed,

1
Fri Jun 22, 2012, 3:18 pm

location info source

CI-2009 MRc5:Regional Materials
posted by  Daniela Castro Salgado  on 

Very simple question: What should I write in the "Location Info Source" column of the template: the location of manufacture extraction, the info source or the location of the info source? Thanks!!

1
Fri Aug 31, 2012, 2:48 pm

WEp1 & c3 lav fixtures

CS-2009 WEp1:Water Use Reduction
posted by  charles bell  on 

We are employing 0.5 gpm lav fixtures with sensors and timed cut off at 10 seconds. Can we factor those to 0.125 gpm because the average use will be say 20 seconds?

1
Wed Sep 5, 2012, 10:24 pm

Complex credit compliance?

NC-2009 EAp2:Minimum Energy Performance
posted by  Kath Williams  on 

Project location: National Park Project Scope: Relocation of historic building Designation: Retains SHPO designation MR Credit 2: CIRs state relocation results in contributing to Material Reuse cr

1
Wed Jun 27, 2012, 8:34 pm

Partial tenant occupancy with no core water fixtures

CS-2009 WEp1:Water Use Reduction
posted by  Laurent Kanago  on 

I am working on a project where there are no core spaces and all of the fixtures will be provided by the tenants.

0
1
Thu Jul 5, 2012, 6:15 pm